Both A and R is true and R is the correct explanation of A
Both A and R is true but R is not the correct explanation of A
A is true but R is false
A is false but R is true
A. Both A and R is true and R is the correct explanation of A
h/4
1/2 h
h
2 h
2 metres
2.5 metres
3 metres
None of the above
10 %
15 %
20 %
25 %
Mortise and tenon joint
Oblique mortise and tenon joint
Butt joint
Mitred joint
9 cm × 9 cm × 9 cm
9 cm × 9 cm × 4.5 cm
9 cm × 4.5 cm × 9 cm
1.8 cm × 4.5 cm × 9 cm
Purlin
Cleat
Batten
Strut
Zero
A few degrees
10°
200°
Ridge
Hip
Valley
None of these
25 mm
40 mm
65 mm
100 mm
Bearing capacity is low
Permeability is uncertain
Particles are cohesive
Property to undergo a volumetric change due to variation of moisture content
Granite
Chalk
Slate
Sand stone
Turn
Junction
Quion
All the above
Simplex pile
Franki pile
Pressure pile
Vibro pile
Grouting
Chemical action
Drainage
Compaction
Simplex pile
Mac-Arthur pile
Raymond pile
Franki pile
Haunch
Spandril
Voussoirs
Skewbacks
Brick on edge
Brick on end
Brick on bed
Brick held vertically
Heart shakes
Cupshakes
Starshakes
Rindgalls
Jambs
Lintels
Reveals
Soffits
Under-ream pile
Friction pile
Bearing pile
Sheet pile
Column footing
Grillage footing
Raft footing
All the above
Cracks appear on the plastered surface in the form of hair cracks
In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water
Excessive thermal variations in the backing or plaster causes the plaster to fall
All the above
Double Flemish bond facing and English bond backing in each course
English bond facing and double Flemish bond backing in each course
Stretcher bond facing and double Flemish bond backing in each course
Double Flemish bond facing and header bond backing in each course
25 to 50 mm
25 to 75 mm
30 to 125 mm
50 to 100 mm
Chamfered ashlar masonry
Ashlar facing masonry
Random coursed ashlar masonry
Coursed ashlar masonry
Friction pile
Bearing pile
Friction bearing pile
Rough pile
25 mm
25 to 40 mm
40 to 65 mm
65 to 100 mm
The lowest layer consists of consolidated ground
A 10 cm thick clean sand is laid on consolidated ground
A 10 cm lime concrete (1 : 4 : 8) is laid on clean sand
A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer
1 in 20
1 to 50
1 in 10
1 in 5
Auger boring
Percussion drilling
Diamond drilling
Wash boring