Question No : 50
PERT and CPM are
Question No : 51
Routing
Question No : 52
Critical path on PERT/CPM chart is obtained by joining the events having
Question No : 53
Work study is mainly aimed at
Question No : 54
In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if
Question No : 55
Break-even analysis shows profit when
Question No : 56
In time study, the rating factor is applied to determine