Question No : 50
PERT and CPM are

Techniques to determine project status
Decision making techniques
Charts which increase aesthetic appearance of rooms
Aids to the decision maker

Question No : 51
Routing

Prescribes the sequence of operations to be followed
Determines the programme for the operations
Is concerned with starting of processes
Regulates the progress of job through various processes

Question No : 52
Critical path on PERT/CPM chart is obtained by joining the events having

Maximum slack
Minimum slack
Average slack
No slack

Question No : 53
Work study is mainly aimed at

Determining the most efficient method of performing a job
Establishing the minimum time of completion of a job
Developing the standard method and standard time of a job
Economising the motions involved on the part of the worker while performing a job

Question No : 54
In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if

Complete details of items in, waiting line are known
Arrival and waiting times are known and can be grouped to form a waiting line model
All variables and constants are known and form a linear equation
The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known

Question No : 55
Break-even analysis shows profit when

Sales revenue > total cost
Sales revenue = total cost
Sales revenue < total cost
Variable cost < fixed cost

Question No : 56
In time study, the rating factor is applied to determine

Standard time of a job
Merit rating of the worker
Fixation of incentive rate
Normal time of a worker