4

Curing

A. Reduces the shrinkage of concrete

B. Preserves the properties of concrete

C. Prevents the loss of water by evaporation

D. All of the above

Correct Answer :

D. All of the above


Related Questions

What is the correct answer?

4

Specified compressive strength of concrete is obtained from cube tests at the end of

A. 3 days

B. 7 days

C. 21 days

D. 28 days

What is the correct answer?

4

Sands of zone I are:

A. Course

B. Medium

C. Medium to fine

D. Fine

What is the correct answer?

4

Permissible compressive strength of M 300 concrete grade is

A. 100 kg/cm2

B. 150 kg/cm2

C. 200 kg/cm2

D. 300 kg/cm2

What is the correct answer?

4

Workability improved by adding

A. Air-entraining agent

B. Foaming agent

C. Oily-agent

D. All the above

What is the correct answer?

4

If the slump of a concrete mix is 60 mm, its workability is

A. Very low

B. Low

C. Medium

D. High

What is the correct answer?

4

Pick up the incorrect statement from the following:

A. The bottom and top ends of slump mould are parallel to each other

B. The axis of the mould is perpendicular to the end faces

C. The internal surface of the mould is kept clean and free from set cement

D. The mould is in the form of a frustum of hexagonal pyramid

What is the correct answer?

4

The factor of safety for

A. Steel and concrete are same

B. Steel is lower than that for concrete

C. Steel is higher than that for concrete

D. None of the above

What is the correct answer?

4

Concrete is unsuitable for compaction by a vibrator if it is

A. Dry

B. Earth moist

C. Semi-plastic

D. Plastic

What is the correct answer?

4

For the design of retaining walls, the minimum factor of safety against overturning is taken as

A. 1.5

B. 2.0

C. 2.5

D. 3.0

What is the correct answer?

4

According to IS: 4561978, the column or the strut is the member whose effective length is greater than

A. The least lateral dimension

B. 2 times the least lateral dimension

C. 3 times the least lateral dimension

D. 4 times the least lateral dimension

What is the correct answer?

4

Pick up the incorrect statement from the following:

A. Concrete for which preliminary tests are conducted, is called controlled concrete

B. Bulking of sand depends upon the fineness of grains

C. Concrete mix 1 : 6 : 12, is used for mass concrete in piers

D. All the above

What is the correct answer?

4

An excess of flaky particles in concrete aggregates

A. Decreases the workability

B. Increases the quantity of water and sand

C. More than 15% are not desirable

D. All the above

What is the correct answer?

4

While designing the pile as a column, the end conditions are nearly

A. Both ends hinged

B. Both ends fixed

C. One end fixed and other end hinged

D. One end fixed and other end free

What is the correct answer?

4

High carbon content in the steel causes

A. Decrease in tensile strength but increase in ductility

B. Increase in tensile strength but decrease in ductility

C. Decrease in both tensile strength and ductility

D. Increase in both tensile strength and ductility

What is the correct answer?

4

Pick up the incorrect statement from the following:

A. The degree of grinding of cement, is called fineness

B. The process of changing cement paste into hard mass, is known as setting of cement

C. The phenomenon by virtue of which cement does not allow transmission of sound, is known as soundness of cement

D. The heat generated during chemical reaction of cement with water, is known as heat of hydration

What is the correct answer?

4

High temperature

A. Increases the strength of concrete

B. Decreases the strength of concrete

C. Has no effect on the strength of concrete

D. None of these

What is the correct answer?

4

The concrete mix which causes difficulty in obtaining a smooth finish, possess

A. Segregation

B. Internal friction

C. Hardness

D. Bleeding

What is the correct answer?

4

Sand generally contains salt if it is obtained from:

A. Nala beds

B. River beds

C. Sea beds

D. None of these

What is the correct answer?

4

For compacting plain concrete road surface of thickness less than 20 cm, we use

A. Internal vibrator

B. Screed vibrator

C. Form vibrator

D. None of these

What is the correct answer?

4

The maximum thickness of concrete floor of a cement warehouse, is

A. 10 cm

B. 15 cm

C. 20 cm

D. 25 cm

What is the correct answer?

4

Pick up the correct statement from the following:

A. Water cement paste hardens due to hydration

B. During hardening cement binds the aggregates together

C. Cement provides strength, durability and water tightness to the concrete

D. All the above

What is the correct answer?

4

The cement becomes useless if its absorbed moisture content exceeds

A. 1 %

B. 2 %

C. 3 %

D. 5 %

What is the correct answer?

4

The light weight aggregates are obtained from

A. Sedimentary rocks

B. Metamorphic rocks

C. Igneous rocks

D. Volcanic source

What is the correct answer?

4

The factor which affects workability, is

A. Water content and its temperature

B. Shape and size of the aggregates

C. Air entraining agents

D. All the above

What is the correct answer?

4

The final operation of finishing floors, is known as

A. Screeding

B. Floating

C. Trowelling

D. Finishing

What is the correct answer?

4

The minimum percentage of chemical ingredient of cement is that of

A. Magnesium oxide

B. Iron oxide

C. Alumina

D. Lime

What is the correct answer?

4

Pick up the incorrect statement applicable to the field test of good cement.

A. When one thrusts one's hand into a bag of cement, one should feel warm

B. The colour of the cement is bluish

C. By rubbing cement in between fingers, one should feed rough

D. All the above

What is the correct answer?

4

C.R.R.I. charts are used to obtain a relationship between strength of concrete and

A. Water cement ratio

B. Workability

C. Grading of aggregate

D. Fineness modulus

What is the correct answer?

4

If P, Y and Z are the weights of cement, fine aggregates and coarse aggregates respectively and W/C is the water cement ratio, the minimum quantity of water to be added to first batch, is obtained by the equation

A. 0.1P + 0.3Y + 0.1Z = W/C × P

B. 0.3P + 0.1Y + 0.01Z = W/C × P

C. 0.4P + 0.2Y + 0.01Z = W/C × P

D. 0.5P + 0.3Y + 0.01Z = W/C × P

What is the correct answer?

4

For a concrete mix 1:3:6 and water cement ratio 0.6 both by weight, the quantity of water required per bag, is

A. 10 kg

B. 12 kg

C. 14 kg

D. 16 kg