The lowest layer consists of consolidated ground
A 10 cm thick clean sand is laid on consolidated ground
A 10 cm lime concrete (1 : 4 : 8) is laid on clean sand
A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer
D. A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer
10 m
20 m
30 m
40 m
Laying bricks as stretchers in cement mortar
Laying bricks as headers in cement mortar
Reinforcing brick wall with iron straps
Constructing brick work within a wooden framework
Turn
Junction
Quion
All the above
(i) and (iii)
(i) and (iv)
(ii) and (iii)
(ii) and (iv)
In a king post truss, principal rafter and tie beams are jointed together with a bridle joint
Joint between the principal rafter and the king post is made by making tenon and mortise respectively
Joint between strut and king post, is generally of mortise and tenon type
All the above
Pitched and sloping roof
Flat roof
Shell roof
None of the above
Louvered door is generally provided in bath rooms
Flush door is generally provided in dining room
Revolving door is generally provided in cinema halls
Sliding door is generally provided in show rooms
Transoms
Horns
Stops
Chocks
1 in 20
1 to 50
1 in 10
1 in 5
Simplex pile
Pedestal pile
Vibro pile
Both (a) and (c) of the above
12
18
24
25
Platform
Relief
Rest
Landing
5 to 10 cm
15 to 20 cm
25 to 30 cm
30 to 45 cm
Raft foundation
Grillage foundation
Well foundation
Isolated footing
Random rubble masonry
Course rubble masonry
Uncoursed rubble masonry
Ashlar masonry
Hacking
Dubbing out
Blistering
Peeling
At the centre of the base
Within the middle third of the base
Within the middle fifth of the base
Neither (a), (b) nor (c)
Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole
Caving or mixing of strata are caused in soft soils or cohesionless soils
The soil to a considerable depth below the bottom of the hole gets disturbed
All the above
Ridge board
Hip rafter
Eaves board
Valley rafter
Soffit
Intrados
Haunch
Back
The maximum projection of the corbel should not be more than the thickness of the wall
The maximum projection of each corbel course should be limited to a quarter brick at a time
The discontinuous corbels are used to carry heavy concentrated loads
Stretcher bond is generally used for the construction of brick corbel
In Flemish bond, headers and stretchers are laid alternately in the same course
In Flemish bond every header in each course lies centrally over every stretcher of the underlying course
In English bond, stretchers are laid in every course
In English bond, headers and stretchers are laid in alternate courses
Free from voids
Glossy
Durable
Uniform
Stretcher
Face
Front
Header
The seismic method
Electrical resistivity method
Gravitational method
Both (a) and (b) of the above
Plaster of Paris
Barium plaster
Martin's cement
Keen's cement
25 mm
25 to 40 mm
40 to 65 mm
65 to 100 mm
The width of the wall is constructed thicker at the base in a stepped fashion
A long vertical load transferring concrete structure is called a concrete pile
In pile which transfers the load to the soil by the friction between the pile and the surrounding soil is called friction pile
The pile which transfers the load to a hard rock bed at certain depth is called load bearing
Baluster
Header
String
Beam
Draining sub-soil water
Ramming crushed stone in soil
Driving sand piles
Watering surface of soil