Stretcher
Face
Front
Header
A. Stretcher
Recessed pointing
Weather pointing
V-pointing
Tuck pointing
Skew back
Soffit
Spandril
Haunch
Mosaic floor
Terrazzo floor
Chips floor
Marble floor
Raft foundation
Grillage foundation
Well foundation
Isolated footing
Vibro pile
Pressure pile
Franki pile
Pedestal pile
90 mm
150 mm
190 mm
200 mm
The operation theatre unit to be detached as it requires sterilized zone but near the ward for the patients and doctor
The mortuary should be detached from the main circulation with a post-mortem room
Casualty unit should be provided a separate entrance
All the above
5 mm
10 mm
15 mm
20 mm
Baluster
Header
String
Beam
Centring
Actual laying of arch work
Striking of centring
None of the above
Construction piles
Raking piles
Eccentric piles
Sinking piles
The lowest layer consists of consolidated ground
A 10 cm thick clean sand is laid on consolidated ground
A 10 cm lime concrete (1 : 4 : 8) is laid on clean sand
A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer
Brick on edge
Brick on end
Brick on bed
Brick held vertically
Lack of ventilation
Alternate wet and dry conditions
Complete submergence in water
None of the above
10 mm
20 mm
30 mm
40 mm
Round steps
Angular steps
Winders
Radial steps
1/6th of the span
1/8th of the span
1/10th of the span
1/12th of the span
25°
30°
40°
50°
Plaster of Paris
Barium plaster
Martin's cement
Keen's cement
In a king post truss, principal rafter and tie beams are jointed together with a bridle joint
Joint between the principal rafter and the king post is made by making tenon and mortise respectively
Joint between strut and king post, is generally of mortise and tenon type
All the above
Header
Stretcher
Closer
None of these
Copper sheets
Lead sheets
Aluminium sheets
All the above
Sides of beams and girders
Column forms
Bottom of beams and girders
All the above at the same time
5 to 10 cm
15 to 20 cm
25 to 30 cm
30 to 45 cm
Horizontal D.P.C. is provided at plinth level in internal walls
D.P.C. is provided under door and verandah openings
Vertical D.P.C. is not provided in internal walls
Cement concrete is a rigid damp-proofing material
Header
Stretcher
Closer
None of these
5 m
10 m
15 m
20 m
D.P.C. should be continuous
D.P.C. should be of good impervious material
D.P.C. may be horizontal or vertical
All the above
Topping
Bedding
Screeding
None of these
25 mm
40 mm
65 mm
100 mm