Home
Current Affairs January 2024

What is the correct answer?

4

The rear teeth of a broach

A. Perform burnishing operation

B. Remove minimum metal

C. Remove maximum metal

D. Remove no metal

Correct Answer :

C. Remove maximum metal


Related Questions

What is the correct answer?

4

The actual feed in centerless grinders is given by (where d = Dia. of regulating wheel, n = Revolutions per minute, and α = Angle of inclination of wheel)

A. πd

B. πdn

C. πdn sinα

D. πdn cosα

What is the correct answer?

4

The main purpose of a boring operation, as compared to drilling, is to

A. Drill a hole

B. Finish the drilled hole

C. Correct the hole

D. Enlarge the existing hole

What is the correct answer?

4

Internal or external threads of different pitches can be produced by

A. Pantograph milling machine

B. Profiling machine

C. Planetary milling machine

D. Piano miller

What is the correct answer?

4

A CNC vertical milling machine has to cut a straight slot of 10 mm width and 2mm depth by a cutter of 10 mm diameter between points (0,0) and (100,100) on the XY plane (dimensions in mm). The feed rate used for milling is 50 mm/min, milling time for the slot (in seconds) is

A. 120

B. 170

C. 180

D. 240

What is the correct answer?

4

In _________ operation, the chip thickness is minimum at the beginning of the cut and it reaches to the maximum when the cut terminates.

A. Conventional milling

B. Climb milling

C. Face milling

D. End milling

What is the correct answer?

4

High speed steel drills can be operated at about _________ the speed of high carbon steel drills.

A. One-half

B. One-fourth

C. Double

D. Four times

What is the correct answer?

4

In electrochemical machining, the gap between the tool and work is kept as

A. 0.1 mm

B. 0.4 mm

C. 0.35

D. 0.75 mm

What is the correct answer?

4

Ceramic tools are fixed to tool body by

A. Soldering

B. Brazing

C. Welding

D. Clamping

What is the correct answer?

4

The common welding error that occurs due to wrong speed, faulty preparation, and high / low current, improper electrode size is called?

A. Distortion

B. Warping

C. Porous weld

D. Poor fusion

What is the correct answer?

4

A bottoming tap has

A. Its end tapered for about three or four threads

B. Its end tapered for about eight or ten threads

C. Full threads for the whole of its length

D. None of the above

What is the correct answer?

4

The operation performed on a shaper is

A. Machining horizontal surface

B. Machining vertical surface

C. Machining angular surface

D. All of these

What is the correct answer?

4

A fine grained grinding wheel is used to grind

A. Hard and brittle materials

B. Soft and ductile materials

C. Hard and ductile materials

D. Soft and brittle materials

What is the correct answer?

4

The angle between the shear plane and __________ is called shear angle.

A. Work surface

B. Tool face

C. Machine surface

D. None of these

What is the correct answer?

4

Which one among the following welding processes uses nonconsumable electrode?

A. Gas metal arc welding

B. Submerged arc welding

C. Gas tungsten arc welding

D. Flux coated arc welding

What is the correct answer?

4

A coarse grained grinding wheel is used to grind

A. Hard and brittle materials

B. Soft and ductile materials

C. Hard and ductile materials

D. Soft and brittle materials

What is the correct answer?

4

Larger end cutting edge angle _________ tool life.

A. Increases

B. Decreases

C. Does not effect

D. None of these

What is the correct answer?

4

The process of removing metal by a cutter which is rotated against the direction of travel of workpiece, is called

A. Up milling

B. Down milling

C. Face milling

D. End milling

What is the correct answer?

4

Volume of a cube of side l and volume of a sphere of radius r are equal. Both the cube and the sphere are solid and of same material. They are being cast. The ratio of the solidification time of the cube to the same of the sphere is

A. (4π/6)³ × (r/l)⁶

B. (4π/6) × (r/l)²

C. (4π/6)² × (r/l)³

D. (4π/6)² × (r/l)⁴

What is the correct answer?

4

In machining metals, chips break due to __________ of work material.

A. Toughness

B. Ductility

C. Elasticity

D. Work hardening

What is the correct answer?

4

Which of the following operation is first performed?

A. Spot facing

B. Boring

C. Tapping

D. Drilling

What is the correct answer?

4

In centreless grinding, work place centre will be

A. Above the line joining the two wheel centres

B. Below the line joining the two wheel centres

C. On the line joining the two wheel centres

D. At the intersection of the line joining the wheel centres with the work place plane

What is the correct answer?

4

The drill spindles are provided with standard taper known as

A. Morse taper

B. Seller's taper

C. Chapman taper

D. Brown and Sharpe taper

What is the correct answer?

4

A left hand tool on a lathe cuts most efficiently when it travels

A. From left to right end of the lathe bed

B. From right to left end of the lathe bed

C. With the help of a compound slide

D. Across the bed

What is the correct answer?

4

The angle between the lathe centres is

A. 30°

B. 45°

C. 60°

D. 90°

What is the correct answer?

4

Chip breakers are used to

A. Increase tool life

B. Remove chips from bed

C. Break the chips into short segments

D. To minimise heat generation

What is the correct answer?

4

Work speed of circular electrode of 220 mm diameter for carrying out seam welding at 4 welds per cm on 1.6 mm thick mild steel tube. Welding cycle consists of 3 cycles on and 2 cycles off Power supply is at 50 Hz. Calculate R.P.M. and energy requirement of the above circular electrodes assuming effective resistance between electrodes as 100 ohm.

A. 2.17 rpm, 600 joules

B. 6.8 rpm, 6 joules

C. 5.03 rpm, 600 joules

D. 22 rpm, 600 joules

What is the correct answer?

4

The soft grade grinding wheels are denoted by the letters

A. A to H

B. I to P

C. Q to Z

D. A to P

What is the correct answer?

4

For harder alloy steel, the point angle of the drill is kept

A. Equal to 118°

B. Less than 118°

C. More than 118°

D. Any one of these

What is the correct answer?

4

The type of tool used on lathe, shaper and planer is

A. Single point cutting tool

B. Two point cutting tool

C. Three point cutting tool

D. Multipoint cutting tool

What is the correct answer?

4

When the end of a tap is tapered for about three or four threads, it is known as a

A. Taper tap

B. Bottoming tap

C. Second tap

D. None of these