Home
Current Affairs January 2024

What is the correct answer?

4

The sound which continues even after its source is cut off, is called

A. Reverberation

B. Echo

C. Intensity of sound

D. Interference

Correct Answer :

A. Reverberation


Related Questions

What is the correct answer?

4

The angle between skew back of a flat arch and the horizontal, is kept approximately equal to

A.

B. 30°

C. 60°

D. 90°

What is the correct answer?

4

The bearing capacity of piles is determined by

A. Dynamic formula

B. Static formula

C. Pile load tests

D. All the above

What is the correct answer?

4

A wall constructed to resist the pressure of an earth filling, is called

A. Retaining wall

B. Breast wall

C. Buttress

D. Parapet wall

What is the correct answer?

4

The minimum strength of the mortar used in load bearing brick masonry, is

A. 50 N/cm2

B. 100 N/cm2

C. 150 N/cm2

D. 200 N/cm2

What is the correct answer?

4

The lower half portion between crown and skew back of the arch, is called

A. Spandril

B. Haunch

C. Springing

D. Soffit

What is the correct answer?

4

The arrangement made to support an unsafe structure temporarily, is known as

A. Shoring

B. Scaffolding

C. Underpinning

D. Jacking

What is the correct answer?

4

The arrangement of supporting an existing structure by providing supports underneath, is known as

A. Shoring

B. Underpinning

C. Jacking

D. Piling

What is the correct answer?

4

The wedge shaped bricks forming an arch ring, are called

A. Soffits

B. Voussoirs

C. Haunches

D. Spandrils

What is the correct answer?

4

Pick up the correct statement from the following:

A. The roof slabs of multi-storeyed buildings are constructed monolithically to carry the various floor loads

B. The beams of multi-storeyed buildings rest on girders and are the main load transferring members to the columns

C. The slab is spanned across the secondary beams provided between the main beams

D. All of these

What is the correct answer?

4

The construction joints in buildings are provided after

A. 10 m

B. 15 m

C. 20 m

D. 40 m

What is the correct answer?

4

The lower edge of the pitched roof, from where the rain water of the roof surface drops down, is known as

A. Hip

B. Gable

C. Ridge

D. Eaves

What is the correct answer?

4

Pick up the correct statement from the following:

A. The sand in the sand pile is well compacted

B. The sand is kept moist at the time of placing and tamping

C. Sand piles are generally used under column loads

D. All of the above

What is the correct answer?

4

During percussion drilling

A. Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole

B. Caving or mixing of strata are caused in soft soils or cohesionless soils

C. The soil to a considerable depth below the bottom of the hole gets disturbed

D. All the above

What is the correct answer?

4

The type of arch used for high class buildings where appearance is of prime importance, is known as

A. Ashlar arch

B. Rubble arch

C. Gauged brick arch

D. Axed brick arch

What is the correct answer?

4

In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is

A. 2 cm

B. 4 cm

C. 6 cm

D. 8 cm

What is the correct answer?

4

The stone whose crushing strength is least, is

A. Granite

B. Chalk

C. Marble

D. Slate

What is the correct answer?

4

Pile foundation is generally provided if soil is

A. Compressible

B. Water logged

C. Made up

D. All the above

What is the correct answer?

4

Pick up the correct statement from the following:

A. The cost of square rooms is less

B. The expenditure on the foundation and roof for the double storeyed building is nearly half of that for the ground storeyed building

C. The cost of construction of a house may be minimised by restricting the height floors

D. All the above

What is the correct answer?

4

The triangular portion between any two adjacent arches and the tangent to their crowns, is

A. Haunch

B. Spandril

C. Soffit

D. Rise

What is the correct answer?

4

A wall constructed with stones to protect slopes of cuttings in natural ground from the action of weathering agents, is called

A. Retaining wall

B. Breast wall

C. Buttress

D. Parapet wall

What is the correct answer?

4

In jack arch floor, the rise is kept

A. 1/6th of the span

B. 1/8th of the span

C. 1/10th of the span

D. 1/12th of the span

What is the correct answer?

4

Sum of tread and rise must lie between

A. 300 to 350 mm

B. 400 to 450 mm

C. 500 to 550 mm

D. 600 to 650 mm

What is the correct answer?

4

The process of filling hollow spaces of walls before plastering, is known

A. Hacking

B. Dubbing out

C. Blistering

D. Peeling

What is the correct answer?

4

Pick up the correct statement from the following:

A. The pile driven in sand is called sand pile

B. The drilled hole filled with sand is called sand pile

C. The sand piles are used for bearing purposes

D. None of these

What is the correct answer?

4

To obtain good bonding in brick masonry

A. First class bricks are used

B. Vertical joints in alternate courses are kept in plumb line

C. Bats are used where necessary

D. All the above

What is the correct answer?

4

In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used

A. Vibro pile

B. Pressure pile

C. Franki pile

D. Pedestal pile

What is the correct answer?

4

Vertical construction joints are provided where the shearing forces are minimum in the case of

A. Slabs

B. Beams

C. Girders

D. All of these

What is the correct answer?

4

Which one of the following rocks is used for monumental buildings?

A. Granite

B. Marble

C. Sand stone

D. Slate

What is the correct answer?

4

The entrained concrete is used in lining walls and roofs for making

A. Heat insulated

B. Sound insulated

C. Neither (a) nor (b)

D. Both (a) and (b)

What is the correct answer?

4

Ornamental moulded course placed on the top of a wall, is

A. Cornice

B. Coping

C. Frieze

D. Lintel