The cost of square rooms is less
The expenditure on the foundation and roof for the double storeyed building is nearly half of that for the ground storeyed building
The cost of construction of a house may be minimised by restricting the height floors
All the above
D. All the above
Bearing pile
Friction pile
Sheet pile
Battered pile
Stronger
More compact
Costly
None of the above
Granite
Marble
Sand stone
Slate
Sand consists of coarse particles of silica formed due to the disintegration of rocks
The grains of sand are not affected by frost
Sand beds are permeable and do not allow water to rise up between pores due to capillary action
All the above
5 m
10 m
15 m
20 m
1/2 horizontal to 1 vertical
2/3 horizontal to 1 vertical
1 horizontal to 1 vertical
2 horizontals to 1 vertical
A tube of about 2 metres length and 20 cm diameter with a cutting edge
A flap valve at the bottom of tube is provided to extract the soil sample
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand
All the above
Two curved arches
Gothic arches
Ogee arches
Drop gothic arches
H-pile
Pipe pile
Screw pile
Disc pile
Chamfered ashlar masonry
Ashlar facing masonry
Random coursed ashlar masonry
Coursed ashlar masonry
Less
More
Equal
Equal or more
Jambs
Posts
Reveals
Styles
Dining halls
Bath rooms
Living rooms
Verandah
Ceiling
15 cm above floor level
200 cm
Level of the tap
Ranging rod
Steel tape
Levelling staff
Boning rod
At the centre of the base
Within the middle third of the base
Within the middle fifth of the base
Neither (a), (b) nor (c)
Mosaic floor
Terrazzo floor
Chips floor
Marble floor
Retaining wall
Breast wall
Buttress
Parapet wall
Lack of ventilation
Alternate wet and dry conditions
Complete submergence in water
None of the above
3 day
7 days
14 days
21 days
Cavity of a cavity wall should start near ground level
Cavity of a cavity wall should terminate near eaves level of sloping roof
Cavity of a cavity wall should terminate near coping of flat roof with parapet wall
All the above
10 cm
15 cm
20 cm
25 cm
Double Flemish bond facing and English bond backing in each course
English bond facing and double Flemish bond backing in each course
Stretcher bond facing and double Flemish bond backing in each course
Double Flemish bond facing and header bond backing in each course
2 cm
4 cm
6 cm
8 cm
Combined footing
Raft footing
Pier footing
Strap footing
1 in 20
1 to 50
1 in 10
1 in 5
5 to 10 kg/cm2
15 to 20 kg/cm2
30 to 35 kg/cm2
40 to 45 kg/cm2
25 to 50 mm
25 to 75 mm
30 to 125 mm
50 to 100 mm
25°
30°
40°
50°
Finishing of concrete
Curing of concrete
Placing of concrete
Compaction of concrete