Related Questions
What is the correct answer?
4
In the construction of arches, sand box method is used for
B. Actual laying of arch work
What is the correct answer?
4
To obtain good bonding in brick masonry
A. First class bricks are used
B. Vertical joints in alternate courses are kept in plumb line
C. Bats are used where necessary
What is the correct answer?
4
For each storey of a building, the depth of exploration should be
What is the correct answer?
4
The inclined support at the ends of treads and rises of a stair, is known as
What is the correct answer?
4
A wall constructed to resist the pressure of an earth filling, is called
What is the correct answer?
4
The exterior angle between outer faces of a wall, is known as
What is the correct answer?
4
You are asked to design and supervise a truss for a factory to have spans 6 m to 9 m. The type of the truss you will use, is
What is the correct answer?
4
A projecting piece usually provided to support a truss, is
What is the correct answer?
4
The maximum permissible deflection of a timber beam supporting a roof, is
What is the correct answer?
4
The rock formed from the solidification of molten matter (magma) is called:
What is the correct answer?
4
The maximum bearing capacity of soil is that of
What is the correct answer?
4
Pick up the incorrect statement from the following:
A. The function of foundation is to distribute the load of super structure over a large bearing area
B. No timbering is required for shallow trenches
C. Shallow foundations can be constructed on made-up soil
D. Black cotton soil is very good for foundation bed
What is the correct answer?
4
In any good staircase, the maximum and minimum pitch respectively should be
What is the correct answer?
4
The triangular space formed between the extrados and the horizontal line drawn through the crown of an arch is known as
What is the correct answer?
4
For providing a raft foundation, the following activities are involved
1. Ramming the foundation bed
2. Excavation of the soil upto required depth
3. Laying the reinforcement over the foundation bed
4. Curing the cement concrete placed over reinforcement
5. Pouring the cement concrete over the reinforcement The correct sequence is
What is the correct answer?
4
Pick up the correct statement from the following:
A. Lime mortar with cement in the ratio of in 10 is cheaper and better for outside plaster
B. For very cold or very hot climate, a compact and closed plan should be provided
C. On the sea coast, an exposed and open house is generally preferred
What is the correct answer?
4
The raft slab is projected beyond the outer walls of the structure by
What is the correct answer?
4
The nominal thickness of one brick wall in mm, is
What is the correct answer?
4
An ordinary concrete may be made water proof by adding
What is the correct answer?
4
A floor constructed with the 4 to 6 mm marble chips, is know
A. Reinforced marble floor
What is the correct answer?
4
The columns of multi-storeyed buildings are designed to withstand the forces due to
What is the correct answer?
4
The predominant constituent which is responsible for strength in granite is
What is the correct answer?
4
Assertion A : Shishum is used for decorative woodwork. Reason R : Shishum can be polished to an excellent finish. Select your answer according to the coding system given below:
A. Both A and R is true and R is the correct explanation of A
B. Both A and R is true but R is not the correct explanation of A
C. A is true but R is false
D. A is false but R is true
What is the correct answer?
4
The Auger boring method is not suitable for
What is the correct answer?
4
The members which support covering material of a sloping roof, are
What is the correct answer?
4
As compared to stretcher course, the thickness of joints in header course should be
What is the correct answer?
4
In grillage foundations a minimum 15 cm cover is provided on
A. Upper flange of top tier
B. Lower beam of lower tier
C. Ends of external beams
What is the correct answer?
4
In verandah floors outward slope is
What is the correct answer?
4
For brick construction, the lime-sand mortar, is
What is the correct answer?
4
The depth of an arch is the distance between
A. Ground level and springing line
B. Crown and springing line
C. Crown and ground level