Related Questions
What is the correct answer?
4
If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then
What is the correct answer?
4
The process of filling hollow spaces of walls before plastering, is known
What is the correct answer?
4
The floor is rubbed with oxalic acid, for making its surface
What is the correct answer?
4
The vertical distance between the springing line and highest point of the inner curve of an arch is known as
What is the correct answer?
4
The form Work including the props can be removed from beams, only after
What is the correct answer?
4
The term string is used for
A. The underside of a stair
B. Outer projecting edge of a tread
C. A sloping member which supports the steps in a stair
D. A vertical member between two treads
What is the correct answer?
4
The important test to be conducted on a stone used in docks and harbours is
What is the correct answer?
4
The projections of head or sill of a door or window frame are
What is the correct answer?
4
The foundation in which a cantilever beam is provided to join two footings, is known as
What is the correct answer?
4
The bearing capacity of a water logged soil can be improved by
C. Increasing the depth of foundation
What is the correct answer?
4
Couple close roof is suitable for maximum span of
What is the correct answer?
4
The dimensions of a half queen closer, are
D. 1.8 cm × 4.5 cm × 9 cm
What is the correct answer?
4
The type of pointing in which a V-shaped projection outside the wall surface, is provided, is called
What is the correct answer?
4
Engineering news formula for obtaining safe bearing capacity of pile for drop hammer, is,
C. Q = (W × 6)/h (S + 2.5)
D. Q = (W × 2.5)/6 (S + h)
What is the correct answer?
4
Gravels
A. Are cohesionless aggregates
B. Vary in size between 2 to 20 mm
C. Never swell when they come into contact with water
What is the correct answer?
4
The process of keeping concrete moist for a certain period after its finishing, is known as
D. Compaction of concrete
What is the correct answer?
4
In the construction of arches, sand box method is used for
B. Actual laying of arch work
What is the correct answer?
4
The service area in a building means the area occupied by
What is the correct answer?
4
The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is
What is the correct answer?
4
While designing a stair, the product of rise and going is approximately kept equal to
What is the correct answer?
4
To obtain good bonding in brick masonry
A. First class bricks are used
B. Vertical joints in alternate courses are kept in plumb line
C. Bats are used where necessary
What is the correct answer?
4
The columns of multi-storeyed buildings are designed to withstand the forces due to
What is the correct answer?
4
The lower edge of the pitched roof, from where the rain water of the roof surface drops down, is known as
What is the correct answer?
4
The platform at the end of a series of steps, is known as
What is the correct answer?
4
As compared to English bond, double Flemish bond is
What is the correct answer?
4
In jack arch floor, the rise is kept
What is the correct answer?
4
The portion of a brick cut across the width, is called
What is the correct answer?
4
The type of bond in a brick masonry containing alternate courses of stretchers and headers, is called
What is the correct answer?
4
In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used
What is the correct answer?
4
The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as