Dining halls
Bath rooms
Living rooms
Verandah
B. Bath rooms
Pitched and sloping roof
Flat roof
Shell roof
None of the above
Arches require more headroom to span the openings like doors, windows etc.
Arches require strong abutments to withstand arch thrust
Arches are difficult in construction
All of the above
1 day
4 days
7 days
14 days
Ceiling
15 cm above floor level
200 cm
Level of the tap
5
4
3
2
50 N/cm2
100 N/cm2
150 N/cm2
200 N/cm2
Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile
Develops due to lowering of ground water
Both (a) and (b)
Neither (a) not (b)
Shoring
Scaffolding
Underpinning
Jacking
The first coat of stucco plaster is called scratch coat
The second coat of stucco plaster is called brown coat
The third coat of stucco plaster is called white coat
All the above
The column spacing
One-third the column spacing
Half the column spacing
Three-fourth the column spacing
3 day
7 days
14 days
21 days
Mosaic floor
Terrazzo floor
Chips floor
Marble floor
In dog-legged stairs, no space between its flights is provided
In open newel stair, a rectangular well is provided
In geometric stair, a curved shaped well between forward and backward flights, is provided
In geometrical stair, two quarter space landing is provided
Lime mortar with cement in the ratio of in 10 is cheaper and better for outside plaster
For very cold or very hot climate, a compact and closed plan should be provided
On the sea coast, an exposed and open house is generally preferred
All the above
15 mm
25 mm
35 mm
45 mm
Simplex pile
Franki pile
Pressure pile
Vibro pile
10 cm
15 cm
20 cm
25 cm
Is a metamorphic rock
Splits into thin sheets along its bedding planes
Has a smooth surface and contains alumina and silica
Possesses good water absorption capacity
5 mm
10 mm
15 mm
20 mm
Reverberation
Echo
Intensity of sound
Interference
1 day
4 days
7 days
14 days
Scaffolding
Dead shore
Raking shore
Under pinning
L/100
L/150
L/260
L/360
350
420
450
500
D.P.C. should be continuous
D.P.C. should be of good impervious material
D.P.C. may be horizontal or vertical
All the above
Two directions without break in the slope on each side
Two directions with break in the slope on each side
Four directions without break in the slope on each side
Four directions with break in the slope on each side
One course of headers to three or five course of stretchers
Queen closer in provided in each heading course
The middle course of stretchers is started with a header to give proper vertical joints
All the above
Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole
Caving or mixing of strata are caused in soft soils or cohesionless soils
The soil to a considerable depth below the bottom of the hole gets disturbed
All the above
Dining halls
Bath rooms
Living rooms
Verandah
Ridge
Hip
Valley
None of these