10 cm
15 cm
20 cm
25 cm
C. 20 cm
Ceiling
15 cm above floor level
200 cm
Level of the tap
Buttress
Leaf wall
Pilaster
Pillar
The maximum projection of the corbel should not be more than the thickness of the wall
The maximum projection of each corbel course should be limited to a quarter brick at a time
The discontinuous corbels are used to carry heavy concentrated loads
Stretcher bond is generally used for the construction of brick corbel
Compacting the soil
Draining the soil
Increasing the depth of foundation
Grouting
1 day
4 days
7 days
14 days
Hard rock
Moist clay
Soft rock
Coarse sandy soil
Horizontal D.P.C. is provided at plinth level in internal walls
D.P.C. is provided under door and verandah openings
Vertical D.P.C. is not provided in internal walls
Cement concrete is a rigid damp-proofing material
Rocky soils
Clay soils
Sandy soil
All of these
Draining sub-soil water
Ramming crushed stone in soil
Driving sand piles
Watering surface of soil
The roof slabs of multi-storeyed buildings are constructed monolithically to carry the various floor loads
The beams of multi-storeyed buildings rest on girders and are the main load transferring members to the columns
The slab is spanned across the secondary beams provided between the main beams
All of these
Retaining wall
Breast wall
Buttress
Parapet wall
In a king post truss, principal rafter and tie beams are jointed together with a bridle joint
Joint between the principal rafter and the king post is made by making tenon and mortise respectively
Joint between strut and king post, is generally of mortise and tenon type
All the above
Rafter
Ridge
Crown
Eave
Parallel to grains
45° to grains
Perpendicular to grains
Same in all directions
Is a metamorphic rock
Splits into thin sheets along its bedding planes
Has a smooth surface and contains alumina and silica
Possesses good water absorption capacity
The projection of the concrete block beyond the footing over it
The upward soil pressure
The mix of the concrete
All the above
10
12
15
No limit
A tube of about 2 metres length and 20 cm diameter with a cutting edge
A flap valve at the bottom of tube is provided to extract the soil sample
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand
All the above
5 to 10 cm
15 to 20 cm
25 to 30 cm
30 to 45 cm
One course of headers to three or five course of stretchers
Queen closer in provided in each heading course
The middle course of stretchers is started with a header to give proper vertical joints
All the above
Bearing pile
Friction pile
Sheet pile
Battered pile
Both A and R is true and R is the correct explanation of A
Both A and R is true but R is not the correct explanation of A
A is true but R is false
A is false but R is true
25% to total area
30% of total area
40% to total area
50% of total area
Pudlo
Impermo
Snowcem
All of these
Two directions without break in the slope on each side
Two directions with break in the slope on each side
Four directions without break in the slope on each side
Four directions with break in the slope on each side
Haunch
Spandril
Voussoirs
Skewbacks
Coastal regions
Plain regions
Covering large areas
All of the above
Louvered door is generally provided in bath rooms
Flush door is generally provided in dining room
Revolving door is generally provided in cinema halls
Sliding door is generally provided in show rooms
Is the most primitive method for making a hole in the ground
Is generally employed in cohesive and other self soils above water table
Is most economical upto a depth of 5 metres
All the above
Upper flange of top tier
Lower beam of lower tier
Ends of external beams
None to these