Home
Current Affairs January 2024

What is the correct answer?

4

The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to

A. 10 mm

B. 20 mm

C. 30 mm

D. 40 mm

Correct Answer :

D. 40 mm


Related Questions

What is the correct answer?

4

Ornamental moulded course placed on the top of a wall, is

A. Cornice

B. Coping

C. Frieze

D. Lintel

What is the correct answer?

4

As compared to English bond, double Flemish bond is

A. Stronger

B. More compact

C. Costly

D. None of the above

What is the correct answer?

4

In which of the following directions, the strength of timber is maximum?

A. Parallel to grains

B. 45° to grains

C. Perpendicular to grains

D. Same in all directions

What is the correct answer?

4

The vertical faces of a door opening which support frame of the door, are

A. Jambs

B. Posts

C. Reveals

D. Styles

What is the correct answer?

4

The dimensions of a half queen closer, are

A. 9 cm × 9 cm × 9 cm

B. 9 cm × 9 cm × 4.5 cm

C. 9 cm × 4.5 cm × 9 cm

D. 1.8 cm × 4.5 cm × 9 cm

What is the correct answer?

4

Bearing capacity of soils cannot be improved by

A. Draining sub-soil water

B. Ramming crushed stone in soil

C. Driving sand piles

D. Watering surface of soil

What is the correct answer?

4

The thickness of a reinforced brick partition wall, is generally kept

A. 5 cm

B. 10 cm

C. 15 cm

D. 20 cm

What is the correct answer?

4

If the depth of an excavation is 20 metres, number of single stage well points to be installed at various levels, is

A. 5

B. 4

C. 3

D. 2

What is the correct answer?

4

The wedge shaped bricks forming an arch ring, are called

A. Soffits

B. Voussoirs

C. Haunches

D. Spandrils

What is the correct answer?

4

The vertical distance between the springing line and highest point of the inner curve of an arch is known as

A. Intrados

B. Rise

C. Spandril

D. Extrados

What is the correct answer?

4

To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act

A. At the centre of the base

B. Within the middle third of the base

C. Within the middle fifth of the base

D. Neither (a), (b) nor (c)

What is the correct answer?

4

Pick up the correct statement from the following:

A. The cost of square rooms is less

B. The expenditure on the foundation and roof for the double storeyed building is nearly half of that for the ground storeyed building

C. The cost of construction of a house may be minimised by restricting the height floors

D. All the above

What is the correct answer?

4

The minimum distance between the centres of bulb of diameter du, of a multi under reamed piles, is

A. du

B. 1.25 du

C. 1.5 du

D. 1.75 du

What is the correct answer?

4

For different layers of cement concrete floor. Pick up the incorrect statement from the following:

A. The lowest layer consists of consolidated ground

B. A 10 cm thick clean sand is laid on consolidated ground

C. A 10 cm lime concrete (1 : 4 : 8) is laid on clean sand

D. A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer

What is the correct answer?

4

Pick up the correct statement from the following:

A. The pile driven in sand is called sand pile

B. The drilled hole filled with sand is called sand pile

C. The sand piles are used for bearing purposes

D. None of these

What is the correct answer?

4

The type of roof which slopes in two directions with a break in the slope on each side is known as

A. Gable roof

B. Hip roof

C. Gambrel roof

D. Mansard roof

What is the correct answer?

4

A pre-stressed concrete pile is

A. Easy to handle

B. Lighter in weight

C. Extremely durable

D. All the above

What is the correct answer?

4

The piece of a brick cut along the centre of width in such a way that its length is equal to that of full brick, is called

A. Half brick

B. Queen closer

C. King closer

D. Bevelled closer

What is the correct answer?

4

Pitched and sloping roofs are suitable for

A. Coastal regions

B. Plain regions

C. Covering large areas

D. All of the above

What is the correct answer?

4

The process of filling hollow spaces of walls before plastering, is known

A. Hacking

B. Dubbing out

C. Blistering

D. Peeling

What is the correct answer?

4

The type of bond in a brick masonry containing alternate courses of stretchers and headers, is called

A. Flemish bond

B. English bond

C. Stretcher bond

D. Header bond

What is the correct answer?

4

The raft slab is projected beyond the outer walls of the structure by

A. 5 to 10 cm

B. 15 to 20 cm

C. 25 to 30 cm

D. 30 to 45 cm

What is the correct answer?

4

During percussion drilling

A. Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole

B. Caving or mixing of strata are caused in soft soils or cohesionless soils

C. The soil to a considerable depth below the bottom of the hole gets disturbed

D. All the above

What is the correct answer?

4

The foundation in which a cantilever beam is provided to join two footings, is known as

A. Strip footing

B. Strap footing

C. Combined footing

D. Raft footing

What is the correct answer?

4

The type of pointing in which upper side of mortar joints is kept about 12 mm inside the face of the masonry and bottom is kept flushed with face of wall, is

A. Truck pointing

B. Recessed pointing

C. Struck pointing

D. Grooved pointing

What is the correct answer?

4

In the method of tube boring of soil investigation, the following is essential:

A. A tube of about 2 metres length and 20 cm diameter with a cutting edge

B. A flap valve at the bottom of tube is provided to extract the soil sample

C. The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand

D. All the above

What is the correct answer?

4

The depth of an arch is the distance between

A. Ground level and springing line

B. Crown and springing line

C. Crown and ground level

D. Intrados and extrados

What is the correct answer?

4

For constructing a terrazzo floor, Pick up the incorrect statement from the following:

A. A base course is prepared as in cement concrete flooring

B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling

C. Glass strips are driven into the layer according to the pattern required

D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material

What is the correct answer?

4

Arches in the form of masonry arcs struck from more than four centres, are called

A. Two curved arches

B. Gothic arches

C. Ogee arches

D. Drop gothic arches

What is the correct answer?

4

The rock formed from the solidification of molten matter (magma) is called:

A. Sedimentary rock

B. Metamorphic rock

C. Igneous rock

D. None of the above