10 mm
20 mm
30 mm
40 mm
D. 40 mm
Cornice
Coping
Frieze
Lintel
Stronger
More compact
Costly
None of the above
Parallel to grains
45° to grains
Perpendicular to grains
Same in all directions
Jambs
Posts
Reveals
Styles
9 cm × 9 cm × 9 cm
9 cm × 9 cm × 4.5 cm
9 cm × 4.5 cm × 9 cm
1.8 cm × 4.5 cm × 9 cm
Draining sub-soil water
Ramming crushed stone in soil
Driving sand piles
Watering surface of soil
5 cm
10 cm
15 cm
20 cm
5
4
3
2
Soffits
Voussoirs
Haunches
Spandrils
Intrados
Rise
Spandril
Extrados
At the centre of the base
Within the middle third of the base
Within the middle fifth of the base
Neither (a), (b) nor (c)
The cost of square rooms is less
The expenditure on the foundation and roof for the double storeyed building is nearly half of that for the ground storeyed building
The cost of construction of a house may be minimised by restricting the height floors
All the above
du
1.25 du
1.5 du
1.75 du
The lowest layer consists of consolidated ground
A 10 cm thick clean sand is laid on consolidated ground
A 10 cm lime concrete (1 : 4 : 8) is laid on clean sand
A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer
The pile driven in sand is called sand pile
The drilled hole filled with sand is called sand pile
The sand piles are used for bearing purposes
None of these
Gable roof
Hip roof
Gambrel roof
Mansard roof
Easy to handle
Lighter in weight
Extremely durable
All the above
Half brick
Queen closer
King closer
Bevelled closer
Coastal regions
Plain regions
Covering large areas
All of the above
Hacking
Dubbing out
Blistering
Peeling
Flemish bond
English bond
Stretcher bond
Header bond
5 to 10 cm
15 to 20 cm
25 to 30 cm
30 to 45 cm
Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole
Caving or mixing of strata are caused in soft soils or cohesionless soils
The soil to a considerable depth below the bottom of the hole gets disturbed
All the above
Strip footing
Strap footing
Combined footing
Raft footing
Truck pointing
Recessed pointing
Struck pointing
Grooved pointing
A tube of about 2 metres length and 20 cm diameter with a cutting edge
A flap valve at the bottom of tube is provided to extract the soil sample
The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand
All the above
Ground level and springing line
Crown and springing line
Crown and ground level
Intrados and extrados
A base course is prepared as in cement concrete flooring
A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling
Glass strips are driven into the layer according to the pattern required
After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material
Two curved arches
Gothic arches
Ogee arches
Drop gothic arches
Sedimentary rock
Metamorphic rock
Igneous rock
None of the above