1, 2 and 3 are correct
1 and 4 are correct
2, 3 and 4 are correct
1, 2 and 4 are correct
B. 1 and 4 are correct
LST-EST
LFT-EFT
TL-EFT
All the above
Line organisation
Line and staff organisation
Functional organisation
None of these
Drag line
Hoe
Clam shell
Dipper shovel
Started 5 days later
Completed 5 days later
Performed at slower rate in 15 days
All the above
Kneading
Pressing
Tamping
Vibration
Strict adherence to specifications
Separation of planning and design part
Each individual maintains functional efficiency
All the above
Having a single lump, are called uninodal curves
If symmetrical, are called normal curves
If not symmetrical, are called skew curves
All the above
Executive Engineer
Engineer
Junior Engineer
Assistant Engineer
Event
Dummy
Duration
Float
Yes, because of heavier overheads and handling cost
Yes, because of the very high order of quality control for the factory made components
No, because of repetitive manufacture of a number of elements
No, because of savings in site labour
Small projects
Large and complex projects
Research and development projects
Deterministic activities
Concrete cured
Fixing of door
Plastering of walls
Selecting sites
(a + m + b)/6
(a + 2m + b)/6
(a + 4m + b)/6
(a + 5m + b)/6
Shows the interdependencies of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of these
Cheapest critical activity
Cheapest noncritical activity
Costliest critical activity
Costliest noncritical activity
Total float and free float
Total float and independent float
Free float and independent float
None of the above
Is an improvement upon bar chart method
Provides a realistic approach to daily problems
Avoids delays which are very common in bar charts
All the above
Optimistic time
Pessimistic time
Most likely time
All the above
Normal distribution curve
Poisson's distribution curve
Beta distribution curve
None of the above
Activity of an excavation of a footing
Activity of an excavation which starts at event No. 1 and ends at even No. 2
Activity of excavation which takes 8 units of time
None of these
An activity
An event
Both event and activity
None of the above
Crash time
Normal time
Optimistic time
Between normal time and crash time
3425 kg
5515 kg
4350 kg
2975 kg
Interdependencies of activities
Project progress
Uncertainties
All of the above
Moist loam
Good common earth
Well blasted rock
Wet sticky clay
1, 3, 2, 4
3, 1, 4, 2
3, 1, 2, 4
1, 3, 4, 2
19
14
24
None of these
Acquisition of land
Selection of site
Fmalisation of alignment of work
All the above
Earliest start of an activity is the early event time of the node it leaves.
Latest finish of an activity is the late event time of the node it enters.
Latest start of an activity is its latest finish minus its duration.
None of the above
A person
A firm
An agency
All the above