Total float and free float
Total float and independent float
Free float and independent float
None of the above
A. Total float and free float
Bar chart method
Milestone chart
Critical path method (CPM)
Programme Evaluation and Review Technique (PERT)
1
2
3
4
Its earliest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest finish time and earliest start time for its successor activity
Its earliest finish time and latest start time for its successor activity
Site located
Foundation is being dug
The office area is being cleaned
The invitations are being sent
4 days
6 days
10 days
16 days
Concrete
Loose sand
Asphalt
Firm earth
50 %
84.1 %
99.9 %
100 %
Kneading
Pressing
Tamping
Vibration
Total float and free float
Total float and independent float
Free float and independent float
None of the above
Bar chart
Gantt chart
Modified Mile stone chart
All the above
Its latest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest start time and earliest finish time
Its earliest finish time and earliest start time for its successor activity
Emphasis is given to activities
Uncertainties are not allowed
Activities are represented by arrows
All the above
Instructions by the executive engineers
Construction measurements
Issue of store equipments
Names of the casual labour
Programme Evaluation and Review Technique, is event oriented
Programme Evaluation and Review Technique is not event oriented
Critical Path Method is event oriented
Critical Path method is event oriented
(t1 - t2) - t
t - (t1 - t2)
(t1 + t2) - t
t + (t1 - t2)
The fund for rebuilding a structure when its economic life is over
Raised to meet maintenance costs
The total sum to be paid to the municipal authorities by the tenants
A part of the money kept in reserve for providing additional structures and structural modifications
Dummy
Event
Activity
Contract
Controlling the total quantity at each batch
Weighing accurately, the quantity of each material for a job before mixing
Controlling the quantity of each material into each batch
Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
The difference of latest occurrence time and earliest expected time, is called slack
The activities connecting the events having zero slack, lie on the critical path
The critical path consumes the maximum time
All the above
Only (i) is correct
(i) and (ii) are correct
(i) and (iii) are correct
(ii) and (iii) are correct
Activity of an excavation of a footing
Activity of an excavation which starts at event No. 1 and ends at even No. 2
Activity of excavation which takes 8 units of time
None of these
Free float of the activity must be zero but independent float need not be zero
Independent float must be zero but free float need not be zero
Free float and independent float both must be zero
Free float and independent float both need not be zero
30 kg
300 kg
900 kg
1000 kg
Light construction
Heavy construction
Industrial construction
Private construction
Bulldozer
Clam shell
Scraper
Dump truck
Rs. 8,800
Rs. 7,600
Rs. 6,400
Rs. 5,000
1, 2 and 4
3, 4 and 5
1, 3 and 4
1, 2 and 5
Smooth-wheeled rollers
Vibratory rollers
Sheep foot rollers
Tampers
Rs. 31050
Rs. 34500
Rs. 37950
Rs. 50000
Is always longest
Is always shortest
May be longest
May be shortest