Drag line
Hoe
Clam shell
Dipper shovel
A. Drag line
Site survey
Availability of construction materials
Availability of labour
All the above
20 kg/tonne
30 kg/tonne
40 kg/tonne
50 kg/tonne
Controlling the total quantity at each batch
Weighing accurately, the quantity of each material for a job before mixing
Controlling the quantity of each material into each batch
Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
100% at the site
67% at the site and 33% under procurement
50% at the site and 50% under procurement
33% at the site and 67% under procurement
Greater than earliest event time of the following node
Less than earliest event time of the following node
Less than or equal to earliest event time of the following node
Greater than or equal to earliest event time of the following node
Minimum time
Maximum time
Maximum cost
Minimum cost
2.3% and 84.1%
97.7% and 84.1%
97.7 % and 15.9%
15.9% and 97.7%
Is artificially introduced
Is represented by a dotted line
Does not consume time
All the above
Bar chart
Gantt chart
Modified Mile stone chart
All the above
Event
Free float
Dummy
Constraint
1910
1920
1930
1940
Crash time
Normal time
Optimistic time
Between normal time and crash time
Having a single lump, are called uninodal curves
If symmetrical, are called normal curves
If not symmetrical, are called skew curves
All the above
Positive
Negative
Zero
Same
Drag line
Hoe
Clam shell
Dipper shovel
Executive Engineer
Engineer
Junior Engineer
Assistant Engineer
Unity of command
Effective control at all levels
Delegation of authority
All the above
Determines the status of each activity
Adjusts automatically changes in activity progress
Is a dynamic system
None of these
1, 2 and 3 are correct
1 and 4 are correct
2, 3 and 4 are correct
1, 2 and 4 are correct
Identify the activities which can be delayed without affecting the total float of preceding activity
Identify the activities, which can be delayed without affecting the total float of succeeding activity
Establish priorities
Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities
Minimum
Maximum
Zero
Infinite
Digging of foundation started
Digging of foundation completed
Laying of concrete started
All the above
Acquisition of land
Selection of site
Fmalisation of alignment of work
All the above
EF = ES + D
LS = LF - D
LF = LS + D
All the above
Bar chart method
Milestone chart
Critical path method (CPM)
Programme Evaluation and Review Technique (PERT)
Excavation for foundation
Curing of concrete
Setting of question paper
All the above
Line organisation
Line and staff organisation
Functional organisation
None of these
Cheapest critical activity
Cheapest noncritical activity
Costliest critical activity
Costliest noncritical activity
Site located
Foundation is being dug
The office area is being cleaned
The invitations are being sent
Minor works
Major works
Large projects
All the Above