Small projects
Large and complex projects
Research and development projects
Deterministic activities
C. Research and development projects
Reduce by 200 kg
Increase by 200 kg
Increase by 250 kg
Reduce by 250 kg
Programme Evaluation and Review Technique, is event oriented
Programme Evaluation and Review Technique is not event oriented
Critical Path Method is event oriented
Critical Path method is event oriented
Instructions by the executive engineers
Construction measurements
Issue of store equipments
Names of the casual labour
The float may be positive, zero or negative
If the float is positive and the activity is delayed by a period equal to its total float, the completion of project is not delayed
If the float of an activity is negative, delay in its performance is bound to delay the completion of project
All the above
Its earliest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest finish time and earliest start time for its successor activity
Its earliest finish time and latest start time for its successor activity
Concrete cured
Fixing of door
Plastering of walls
Selecting sites
Minor works
Major works
Large projects
All the Above
20 kg/tonne
30 kg/tonne
40 kg/tonne
50 kg/tonne
Identify the activities which can be delayed without affecting the total float of preceding activity
Identify the activities, which can be delayed without affecting the total float of succeeding activity
Establish priorities
Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities
Event
Float
Duration
Constraint
1, 3, 2, 4
3, 1, 4, 2
3, 1, 2, 4
1, 3, 4, 2
30 kg
300 kg
900 kg
1000 kg
500 cum
1000 cum
1500 cum
2000 cum
Site located
Foundation is being dug
The office area is being cleaned
The invitations are being sent
The fund for rebuilding a structure when its economic life is over
Raised to meet maintenance costs
The total sum to be paid to the municipal authorities by the tenants
A part of the money kept in reserve for providing additional structures and structural modifications
Moist loam
Good common earth
Well blasted rock
Wet sticky clay
An activity
An event
Both event and activity
None of the above
The difference of latest occurrence time and earliest expected time, is called slack
The activities connecting the events having zero slack, lie on the critical path
The critical path consumes the maximum time
All the above
3.5 and 5/6
5 and 25/36
3.5 and 25/36
4 and 5/6
Minimum
Maximum
Zero
Infinite
Is always longest
Is always shortest
May be longest
May be shortest
An engineer
An architect
An owner
All the above
Rigid structure
Extraordinary delay in communications
Top level executions over work
All the above
Effective command and control
Rigid discipline in the organisation
Defined responsibilities at all levels
All the above
Longest duration
Highest cost slope
Least cost slope
Shortest duration
50 %
84.1 %
99.9 %
100 %
Preceding activities
Succeeding activities
The particular activity involved
None of the above
Maximum float
Minimum float
Zero float
None of these
to + 3tm+ tp/3
to + 4tm+ tp/4
to + 4tm+ tp/5
to + 4tm+ tp/6
Both A and R is true and R is the correct explanation of A
Both A and R is true but R is not the correct explanation of A
A is true but R is false
A is false but R is true