What is the correct answer?

4

For constructing a terrazzo floor, Pick up the incorrect statement from the following:

A. A base course is prepared as in cement concrete flooring

B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling

C. Glass strips are driven into the layer according to the pattern required

D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material

Correct Answer :

B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling


Related Questions

What is the correct answer?

4

The brick laid with its breadth parallel to the face of a wall, is known as

A. Header

B. Stretcher

C. Closer

D. None of these

What is the correct answer?

4

To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as

A. Bat

B. Header

C. Stretcher

D. Closer

What is the correct answer?

4

In the construction of arches, sand box method is used for

A. Centring

B. Actual laying of arch work

C. Striking of centring

D. None of the above

What is the correct answer?

4

Pick up the incorrect statement from the following:

A. Horizontal D.P.C. is provided at plinth level in internal walls

B. D.P.C. is provided under door and verandah openings

C. Vertical D.P.C. is not provided in internal walls

D. Cement concrete is a rigid damp-proofing material

What is the correct answer?

4

The type of flooring suitable for use in churches, theatres, public libraries and other places where noiseless floor covering is desired is

A. Cork flooring

B. Glass flooring

C. Wooden flooring

D. Linoleum flooring

What is the correct answer?

4

A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to

A. 10 %

B. 15 %

C. 20 %

D. 25 %

What is the correct answer?

4

The art of bringing the floor to a true level surface by means of screeds, is called

A. Topping

B. Bedding

C. Screeding

D. None of these

What is the correct answer?

4

For providing a raft foundation, the following activities are involved
1. Ramming the foundation bed
2. Excavation of the soil upto required depth
3. Laying the reinforcement over the foundation bed
4. Curing the cement concrete placed over reinforcement
5. Pouring the cement concrete over the reinforcement The correct sequence is

A. 1, 2, 3, 4, 5

B. 5, 4, 3, 2, 1

C. 2, 1, 3, 5, 4

D. 3, 2, 5, 1, 4

What is the correct answer?

4

Rotary drilling is the fastest method in case of

A. Rocky soils

B. Clay soils

C. Sandy soil

D. All of these

What is the correct answer?

4

The ceiling height of a building is

A. Between ceiling and ground level

B. Between ceiling and floor level

C. Upto roof above ground level

D. Upto ceiling from the ground level

What is the correct answer?

4

Bearing capacity of soils cannot be improved by

A. Draining sub-soil water

B. Ramming crushed stone in soil

C. Driving sand piles

D. Watering surface of soil

What is the correct answer?

4

Crown is located at

A. Highest point on the extrados of the arch

B. Highest point on the intrados of the arch

C. Skew-back of the arch

D. None of these

What is the correct answer?

4

The Auger borings are not common

A. In soils that require lateral support

B. In cohesive soils

C. In soft soils

D. None of the above

What is the correct answer?

4

Pick up the incorrect statement from the following:

A. The width of the wall is constructed thicker at the base in a stepped fashion

B. A long vertical load transferring concrete structure is called a concrete pile

C. In pile which transfers the load to the soil by the friction between the pile and the surrounding soil is called friction pile

D. The pile which transfers the load to a hard rock bed at certain depth is called load bearing

What is the correct answer?

4

The black cotton soil

A. Undergoes volumetric changes

B. Swells excessively when wet

C. Shrinks excessively when dry

D. All the above

What is the correct answer?

4

For a rectangular foundation of width b, eccentricity of load should not exceed

A. b/2

B. b/3

C. b/4

D. b/6

What is the correct answer?

4

An arch may fail due to

A. Uneven settlement of abutments

B. Sliding of voussoirs

C. Crushing of the material

D. All the above

What is the correct answer?

4

Pile foundations are suitable for

A. Water logged soils

B. Soft rocks

C. Compact soils

D. Multi-storeyed buildings

What is the correct answer?

4

In high mountainous region, the type of roof generally recommended for buildings, is

A. Shed type

B. Gable type

C. Gambrel type

D. Mansard type

What is the correct answer?

4

The process of keeping concrete moist for a certain period after its finishing, is known as

A. Finishing of concrete

B. Curing of concrete

C. Placing of concrete

D. Compaction of concrete

What is the correct answer?

4

The bearing capacity of a water logged soil, may be improved by

A. Grouting

B. Chemical action

C. Drainage

D. Compaction

What is the correct answer?

4

Pick up the correct statement from the following:

A. English bond is used for brick masonry to support heavy loads

B. Double-Flemish bond is suitable for brick masonry to give uniform face appearance

C. The stretcher bond is used for the construction of half brick masonry brick

D. All the above

What is the correct answer?

4

The bearing capacity of piles is determined by

A. Dynamic formula

B. Static formula

C. Pile load tests

D. All the above

What is the correct answer?

4

The form Work including the props can be removed from beams, only after

A. 3 day

B. 7 days

C. 14 days

D. 21 days

What is the correct answer?

4

The differential settlement in case of foundations on sandy soils should not exceed

A. 25 mm

B. 40 mm

C. 65 mm

D. 100 mm

What is the correct answer?

4

The disease of dry rot in timber is caused by

A. Lack of ventilation

B. Alternate wet and dry conditions

C. Complete submergence in water

D. None of the above

What is the correct answer?

4

The maximum total settlement for raft foundation on clayey soils should be limited to

A. 25 mm

B. 25 to 40 mm

C. 40 to 65 mm

D. 65 to 100 mm

What is the correct answer?

4

Pick up the correct statement from the following:

A. The first coat of stucco plaster is called scratch coat

B. The second coat of stucco plaster is called brown coat

C. The third coat of stucco plaster is called white coat

D. All the above

What is the correct answer?

4

Dampness causes

A. Efflorescence

B. Bleaching of paints

C. Crumbling of plaster

D. Growth of termites

What is the correct answer?

4

In verandah floors outward slope is

A. 1 in 40

B. 1 in 50

C. 1 in 60

D. 1 in 70