What is the correct answer?

4

In high mountainous region, the type of roof generally recommended for buildings, is

A. Shed type

B. Gable type

C. Gambrel type

D. Mansard type

Correct Answer :

C. Gambrel type


Related Questions

What is the correct answer?

4

The form work from the underside of slabs, can be removed only after

A. 1 day

B. 4 days

C. 7 days

D. 14 days

What is the correct answer?

4

The line of intersection of two surfaces of a sloping roof forming an internal angle less than 180°, is known as

A. Ridge

B. Hip

C. Valley

D. None of these

What is the correct answer?

4

A floor constructed with the 4 to 6 mm marble chips, is know

A. Reinforced marble floor

B. Terrazzo floor

C. Marble floor

D. Chip floor

What is the correct answer?

4

Which one of the following piles has a cast iron shoe even after removal of the hollow cylindrical steel casing?

A. Simplex pile

B. Pedestal pile

C. Vibro pile

D. Both (a) and (c) of the above

What is the correct answer?

4

Pick up the correct statement from the following:

A. Inclined borings are made for taking samples under existing structures

B. Inclined borings are occasionally used instead of vertical holes

C. The spacing of inclined borings is kept such that one bore hole is vertically above the bottom of an adjacent bore hole

D. All the above

What is the correct answer?

4

In the construction of arches, sand box method is used for

A. Centring

B. Actual laying of arch work

C. Striking of centring

D. None of the above

What is the correct answer?

4

In verandah floors outward slope is

A. 1 in 40

B. 1 in 50

C. 1 in 60

D. 1 in 70

What is the correct answer?

4

The pile which supports the load partly by friction and partly by resting on hard stratum, is called

A. Friction pile

B. Bearing pile

C. Friction bearing pile

D. Rough pile

What is the correct answer?

4

For effective drainage, the finished surface of flat roof should have a minimum slope of

A. 1 in 20

B. 1 to 50

C. 1 in 10

D. 1 in 5

What is the correct answer?

4

The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as

A. Queen closer

B. Bevelled closer

C. King closer

D. Half king closer

What is the correct answer?

4

The construction joints in buildings are provided after

A. 10 m

B. 15 m

C. 20 m

D. 40 m

What is the correct answer?

4

The minimum depth of foundation in clayey soils is

A. 0.5 m

B. 0.7 m

C. 0.9 m

D. 1.2 m

What is the correct answer?

4

Pick up the correct statement from the following:

A. A combined footing is so proportioned that centre of gravity of supporting area coincides with centre of gravity of two column loads

B. A combined footing may be either rectangular or trapezoidal in shape

C. Trapezoidal shaped footings may be provided under any loading

D. All the above

What is the correct answer?

4

The form work from the slabs excluding props, can be removed only after

A. 1 day

B. 4 days

C. 7 days

D. 14 days

What is the correct answer?

4

Under reamed piles are generally used for

A. Machine foundations

B. Factory building

C. Tall structures

D. All the above

What is the correct answer?

4

Pick up the correct statement from the following:

A. The pile driven in sand is called sand pile

B. The drilled hole filled with sand is called sand pile

C. The sand piles are used for bearing purposes

D. None of these

What is the correct answer?

4

The nominal thickness of an expansion joint in brick walls, is kept more than

A. 5 mm

B. 10 mm

C. 15 mm

D. 20 mm

What is the correct answer?

4

The entrained concrete is used in lining walls and roofs for making

A. Heat insulated

B. Sound insulated

C. Neither (a) nor (b)

D. Both (a) and (b)

What is the correct answer?

4

The stone blocks approximately triangular in shape, used as steps, are known

A. Stone steps

B. Built up steps

C. Spandril steps

D. None of these

What is the correct answer?

4

Pick up the correct statement from the following:

A. The first coat of stucco plaster is called scratch coat

B. The second coat of stucco plaster is called brown coat

C. The third coat of stucco plaster is called white coat

D. All the above

What is the correct answer?

4

The type of ashlar masonry in which stones are finely chisel dressed and thickness of joints does not exceed 3 mm, is

A. Chamfered ashlar masonry

B. Ashlar facing masonry

C. Random coursed ashlar masonry

D. Coursed ashlar masonry

What is the correct answer?

4

The inner section of a cavity wall, is generally known as

A. Buttress

B. Leaf wall

C. Pilaster

D. Pillar

What is the correct answer?

4

Exposed portions of vertical surface at right angles to the door or window frame, are known as

A. Jambs

B. Lintels

C. Reveals

D. Soffits

What is the correct answer?

4

Mansard roof is a roof which slopes in

A. Two directions without break in the slope on each side

B. Two directions with break in the slope on each side

C. Four directions without break in the slope on each side

D. Four directions with break in the slope on each side

What is the correct answer?

4

The mortar in which both cement and lime are used as binding materials, is called

A. Cement mortar

B. Lime mortar

C. Fire resistant mortar

D. Gauged mortar

What is the correct answer?

4

The platform at the end of a series of steps, is known as

A. Platform

B. Relief

C. Rest

D. Landing

What is the correct answer?

4

The opening provided in sloping roof with its top parallel to the roof surface, is called

A. Dormer window

B. Sky light window

C. Lantern window

D. Louvered window

What is the correct answer?

4

The exterior angle between outer faces of a wall, is known as

A. Turn

B. Junction

C. Quion

D. All the above

What is the correct answer?

4

The dimensions of a half queen closer, are

A. 9 cm × 9 cm × 9 cm

B. 9 cm × 9 cm × 4.5 cm

C. 9 cm × 4.5 cm × 9 cm

D. 1.8 cm × 4.5 cm × 9 cm

What is the correct answer?

4

For providing a raft foundation, the following activities are involved
1. Ramming the foundation bed
2. Excavation of the soil upto required depth
3. Laying the reinforcement over the foundation bed
4. Curing the cement concrete placed over reinforcement
5. Pouring the cement concrete over the reinforcement The correct sequence is

A. 1, 2, 3, 4, 5

B. 5, 4, 3, 2, 1

C. 2, 1, 3, 5, 4

D. 3, 2, 5, 1, 4