Pick up the correct statement from the following:

A. Plain cement concrete is equally strong in compression as well as in tension

B. Slump test is performed to check concrete strength

C. Curing of concrete is done for proper compaction of cement

D. Fineness modulus is the index number expressing the relative sizes of both coarse and fine aggregates

Correct Answer :

D. Fineness modulus is the index number expressing the relative sizes of both coarse and fine aggregates


Related Questions

What is the correct answer?

4

Ornamental moulded course placed on the top of a wall, is

A. Cornice

B. Coping

C. Frieze

D. Lintel

What is the correct answer?

4

Rotary drilling is the fastest method in case of

A. Rocky soils

B. Clay soils

C. Sandy soil

D. All of these

What is the correct answer?

4

The skirting/dado in a bath roof should be upto

A. Ceiling

B. 15 cm above floor level

C. 200 cm

D. Level of the tap

What is the correct answer?

4

In any good staircase, the maximum and minimum pitch respectively should be

A. 90° and 0°

B. 75° and 30°

C. 60° and 10°

D. 40° and 25°

What is the correct answer?

4

In horizontal D.P.C, thickness of cement concrete (1 : 2 : 4) is

A. 2 cm

B. 4 cm

C. 6 cm

D. 8 cm

What is the correct answer?

4

The pile which supports the load partly by friction and partly by resting on hard stratum, is called

A. Friction pile

B. Bearing pile

C. Friction bearing pile

D. Rough pile

What is the correct answer?

4

For brick construction, the lime-sand mortar, is

A. 1 : 1

B. 1 : 2

C. 1 : 3

D. 1 : 4

What is the correct answer?

4

The number of steps in a flight generally should not be less than

A. 2

B. 3

C. 5

D. No limit

What is the correct answer?

4

According to National Building Code, the hydrants in water mains is provided at minimum interval of

A. 50 m

B. 60 m

C. 75 m

D. 90 m

What is the correct answer?

4

The compaction of concrete in the drilled pile hole is done by compressed air in the case of

A. Simplex pile

B. Franki pile

C. Pressure pile

D. Vibro pile

What is the correct answer?

4

Pick up the correct statement from the following:

A. The roof slabs of multi-storeyed buildings are constructed monolithically to carry the various floor loads

B. The beams of multi-storeyed buildings rest on girders and are the main load transferring members to the columns

C. The slab is spanned across the secondary beams provided between the main beams

D. All of these

What is the correct answer?

4

A floor constructed with the 4 to 6 mm marble chips, is know

A. Reinforced marble floor

B. Terrazzo floor

C. Marble floor

D. Chip floor

What is the correct answer?

4

In a colar beam roof

A. There is no horizontal tie beam

B. There is a horizontal tie at the feet of rafters only

C. There is a horizontal tie at almost the middle of rafters only

D. There are two horizontal ties, one at the feet and other at the middle of the rafters

What is the correct answer?

4

As compared to English bond, double Flemish bond is

A. Stronger

B. More compact

C. Costly

D. None of the above

What is the correct answer?

4

The opening provided in sloping roof with its top parallel to the roof surface, is called

A. Dormer window

B. Sky light window

C. Lantern window

D. Louvered window

What is the correct answer?

4

Pick up the correct statement from the following:

A. A combined footing is so proportioned that centre of gravity of supporting area coincides with centre of gravity of two column loads

B. A combined footing may be either rectangular or trapezoidal in shape

C. Trapezoidal shaped footings may be provided under any loading

D. All the above

What is the correct answer?

4

The type of bond in a brick masonry containing alternate courses of stretchers and headers, is called

A. Flemish bond

B. English bond

C. Stretcher bond

D. Header bond

What is the correct answer?

4

Which of the following metal sheets is most effective in preventing dampness?

A. Copper sheets

B. Lead sheets

C. Aluminium sheets

D. All the above

What is the correct answer?

4

The highest line of sloping roof, where two opposite slopes meet, is known as

A. Rafter

B. Ridge

C. Crown

D. Eave

What is the correct answer?

4

Depth or height of the arch is the

A. Perpendicular distance between intrados and extrados

B. Vertical distance between springing line and intrados

C. Perpendicular distance between springing line and extrados

D. None of the above

What is the correct answer?

4

For a wall carrying heavy load on low bearing capacity soil,

A. Lean concrete bed is provided

B. Thick concrete bed is provided

C. Reinforced concrete bed is provided

D. Both (a) and (c) of the above

What is the correct answer?

4

Sum of tread and rise must lie between

A. 300 to 350 mm

B. 400 to 450 mm

C. 500 to 550 mm

D. 600 to 650 mm

What is the correct answer?

4

The platform at the end of a series of steps, is known as

A. Platform

B. Relief

C. Rest

D. Landing

What is the correct answer?

4

The concrete slump recommended for foundations, is

A. 25 to 50 mm

B. 30 to 125 mm

C. 50 to 100 mm

D. 75 to 125 mm

What is the correct answer?

4

Pick up the correct statement from the following:

A. A mortar joint having a concave finishing in brick masonry, is called keyed joint

B. A mortar joint projecting beyond the face of a masonry wall, is called tucked joint

C. A mortar joint having a recess in it, is called ruled joint

D. All the above

What is the correct answer?

4

Dutch bond is a modification of

A. English bond

B. Stretcher bond

C. Header bond

D. Single Flemish bond

What is the correct answer?

4

If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is

A. 12

B. 18

C. 24

D. 25

What is the correct answer?

4

The voussoir placed at crown of an arch, is known as a

A. Key

B. Soffit

C. Springer

D. Haunch

What is the correct answer?

4

The form work from the sides of beams can be removed only after

A. 1 day

B. 4 days

C. 7 days

D. 14 days

What is the correct answer?

4

For the construction of flyovers in sandy soils, the type of foundation provided, is

A. Strap footing

B. Raft footing

C. Combined footing

D. Pier footing