A mortar joint having a concave finishing in brick masonry, is called keyed joint
A mortar joint projecting beyond the face of a masonry wall, is called tucked joint
A mortar joint having a recess in it, is called ruled joint
All the above
D. All the above
Sand consists of coarse particles of silica formed due to the disintegration of rocks
The grains of sand are not affected by frost
Sand beds are permeable and do not allow water to rise up between pores due to capillary action
All the above
First class bricks are used
Vertical joints in alternate courses are kept in plumb line
Bats are used where necessary
All the above
There is no horizontal tie beam
There is a horizontal tie at the feet of rafters only
There is a horizontal tie at almost the middle of rafters only
There are two horizontal ties, one at the feet and other at the middle of the rafters
1 day
4 days
7 days
14 days
10 cm
15 cm
20 cm
25 cm
To support the frame work of the roof
To receive the ends of principal rafter
To prevent the walls from spreading outward
To prevent the tie beam from sagging at its centre
Purlin
Cleat
Batten
Strut
English cross bond
Dutch bond
Monk bond
Rat-trap bond
Bat
Header
Stretcher
Closer
Finishing of concrete
Curing of concrete
Placing of concrete
Compaction of concrete
1 : 1
1 : 2
1 : 3
1 : 4
Are suitable for works under sea water
Resist shocks or vibrations
Are suitable for use as batter piles
Are useful for heavy vertical loads
(P/w) × [(1 + sin φ)/(1 - sin φ)]²
(P/w) × [(1 - sin φ)/(1 + sin φ)]²
(P/2w) × [(1 - sin φ)/(1 + sin φ)]²
(P/w) × [(1 + sin φ)/(1 - sin φ)]
Louver
Stop
Horn
Rebate
Random rubble masonry
Course rubble masonry
Uncoursed rubble masonry
Ashlar masonry
Shoring
Scaffolding
Underpinning
Jacking
The sand in the sand pile is well compacted
The sand is kept moist at the time of placing and tamping
Sand piles are generally used under column loads
All of the above
Granite
Chalk
Slate
Sand stone
Highest point on the extrados of the arch
Highest point on the intrados of the arch
Skew-back of the arch
None of these
The operation theatre unit to be detached as it requires sterilized zone but near the ward for the patients and doctor
The mortuary should be detached from the main circulation with a post-mortem room
Casualty unit should be provided a separate entrance
All the above
2
3
5
No limit
Auger boring
Percussion drilling
Diamond drilling
Wash boring
Plain cement concrete is equally strong in compression as well as in tension
Slump test is performed to check concrete strength
Curing of concrete is done for proper compaction of cement
Fineness modulus is the index number expressing the relative sizes of both coarse and fine aggregates
The maximum projection of the corbel should not be more than the thickness of the wall
The maximum projection of each corbel course should be limited to a quarter brick at a time
The discontinuous corbels are used to carry heavy concentrated loads
Stretcher bond is generally used for the construction of brick corbel
Less
More
Equal
Equal or more
Rafter
Ridge
Crown
Eave
Distance of C.G. of the loads from the smaller column = 3.00 m
The length of the foundation slab = 7.00 m
Area of footing slab = 11.00 m2
All the above
Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile
Develops due to lowering of ground water
Both (a) and (b)
Neither (a) not (b)
1 metre
2 metres
3 metres
4 metres
Jambs
Lintels
Reveals
Soffits