The number of steps in a flight generally should not be less than

A. 2

B. 3

C. 5

D. No limit

Correct Answer :

B. 3


Related Questions

What is the correct answer?

4

The triangular portion between any two adjacent arches and the tangent to their crowns, is

A. Haunch

B. Spandril

C. Soffit

D. Rise

What is the correct answer?

4

In any good staircase, the maximum and minimum pitch respectively should be

A. 90° and 0°

B. 75° and 30°

C. 60° and 10°

D. 40° and 25°

What is the correct answer?

4

In flat roof of reinforced cement concrete, the recommended angle of slope, is

A. Zero

B. A few degrees

C. 10°

D. 200°

What is the correct answer?

4

A pointed arch which forms isosceles or equilateral triangle, is generally known as

A. Three centred arch

B. Two centred arch

C. Lancet arch

D. Bull's eye arch

What is the correct answer?

4

For different layers of cement concrete floor. Pick up the incorrect statement from the following:

A. The lowest layer consists of consolidated ground

B. A 10 cm thick clean sand is laid on consolidated ground

C. A 10 cm lime concrete (1 : 4 : 8) is laid on clean sand

D. A 10 cm thick cement concrete (1 : 2 : 4) is laid on top layer

What is the correct answer?

4

In grillage foundations a minimum 15 cm cover is provided on

A. Upper flange of top tier

B. Lower beam of lower tier

C. Ends of external beams

D. None to these

What is the correct answer?

4

The triangular space formed between the extrados and the horizontal line drawn through the crown of an arch is known as

A. Haunch

B. Spandril

C. Voussoirs

D. Skewbacks

What is the correct answer?

4

Pick up the correct statement from the following:

A. D.P.C. should be continuous

B. D.P.C. should be of good impervious material

C. D.P.C. may be horizontal or vertical

D. All the above

What is the correct answer?

4

The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed

A. 5 m

B. 10 m

C. 15 m

D. 20 m

What is the correct answer?

4

The window which is provided in flat roof of a room, is known

A. Dormer window

B. Lantern window

C. Louvered window

D. Sky window

What is the correct answer?

4

The alignment of a cross joint along the plumb line is

A. Bed block

B. Perpend

C. Lintel

D. Vertical line

What is the correct answer?

4

The stone whose crushing strength is least, is

A. Granite

B. Chalk

C. Marble

D. Slate

What is the correct answer?

4

The compaction of concrete in the drilled pile hole is done by compressed air in the case of

A. Simplex pile

B. Franki pile

C. Pressure pile

D. Vibro pile

What is the correct answer?

4

The least bearing capacity of soil is that of

A. Hard rock

B. Moist clay

C. Soft rock

D. Coarse sandy soil

What is the correct answer?

4

The width of the hollow space between two walls of a cavity wall should not exceed

A. 5 cm

B. 7.5 cm

C. 10 cm

D. 15 cm

What is the correct answer?

4

Pick up the correct statement from the following:

A. In a king post truss, principal rafter and tie beams are jointed together with a bridle joint

B. Joint between the principal rafter and the king post is made by making tenon and mortise respectively

C. Joint between strut and king post, is generally of mortise and tenon type

D. All the above

What is the correct answer?

4

The art of bringing the floor to a true level surface by means of screeds, is called

A. Topping

B. Bedding

C. Screeding

D. None of these

What is the correct answer?

4

Pile foundations are suitable for

A. Water logged soils

B. Soft rocks

C. Compact soils

D. Multi-storeyed buildings

What is the correct answer?

4

Expansion joints in masonry walls are provided if length exceeds

A. 10 m

B. 20 m

C. 30 m

D. 40 m

What is the correct answer?

4

The maximum bearing capacity of soil is that of

A. Black cotton soil

B. Loose fine sandy soil

C. Dry coarse sandy soil

D. Hard rocks

What is the correct answer?

4

To obtain good bonding in brick masonry

A. First class bricks are used

B. Vertical joints in alternate courses are kept in plumb line

C. Bats are used where necessary

D. All the above

What is the correct answer?

4

The window which projects outside a room of a building for admitting more light and air, is known

A. Bay window

B. Casement window

C. Lantern window

D. Dormer window

What is the correct answer?

4

The size of a floor tile commonly used, is

A. 15 cm × 15 cm × 1.8 cm

B. 20 cm × 20 cm × 2 cm

C. 22.5 × 22.5 cm × 2.2 cm

D. All the above

What is the correct answer?

4

Stability of an existing structure may be disturbed by

A. Rising of water table

B. Vibrations caused by traffic movements

C. Mining in the neighbourhood

D. All the above

What is the correct answer?

4

The taper of precast concrete pile should not be more than

A. 1 cm per metre length

B. 2 cm per metre length

C. 4 cm per metre length

D. 5 cm per metre length

What is the correct answer?

4

During percussion drilling

A. Ground water observations are hindered due to entry of the slurry in the soil below the bottom of the hole

B. Caving or mixing of strata are caused in soft soils or cohesionless soils

C. The soil to a considerable depth below the bottom of the hole gets disturbed

D. All the above

What is the correct answer?

4

The process of making the back ground rough, before plastering, is

A. Dubbing

B. Hacking

C. Blistering

D. Peeling

What is the correct answer?

4

Pick up the correct statement from the following:

A. Plain cement concrete is equally strong in compression as well as in tension

B. Slump test is performed to check concrete strength

C. Curing of concrete is done for proper compaction of cement

D. Fineness modulus is the index number expressing the relative sizes of both coarse and fine aggregates

What is the correct answer?

4

For the construction of flyovers in sandy soils, the type of foundation provided, is

A. Strap footing

B. Raft footing

C. Combined footing

D. Pier footing

What is the correct answer?

4

The lintels are preferred to arches because

A. Arches require more headroom to span the openings like doors, windows etc.

B. Arches require strong abutments to withstand arch thrust

C. Arches are difficult in construction

D. All of the above