20 kg/tonne
30 kg/tonne
40 kg/tonne
50 kg/tonne
C. 40 kg/tonne
Unity of command
Effective control at all levels
Delegation of authority
All the above
Having a single lump, are called uninodal curves
If symmetrical, are called normal curves
If not symmetrical, are called skew curves
All the above
Identify the activities which can be delayed without affecting the total float of preceding activity
Identify the activities, which can be delayed without affecting the total float of succeeding activity
Establish priorities
Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities
A is correct but R is not correct
R is correct but A is not correct
Both A and R is correct
Both A and R is incorrect
Vertical lines
Horizontal lines
Dots
Crosses
Acquisition of land
Selection of site
Fmalisation of alignment of work
All the above
1 and 4 are correct
2 and 3 are correct
1 and 4 are correct
1 and 2 are correct
3425 kg
5515 kg
4350 kg
2975 kg
Is an improvement upon bar chart method
Provides a realistic approach to daily problems
Avoids delays which are very common in bar charts
All the above
An engineer
An architect
An owner
All the above
Measurement of risks to eliminate failures
Applying the theory' of probability to sample testing or inspection
Reduction in wastage of inspection costs
Reduction in costs for the removal of defects
Rs. 8,43,750
Rs. 8,75,000
Rs. 10,50,000
Rs. 11,56,250
A circle
A square
A triangle
All the above
Minor works
Major works
Large projects
All the Above
Programme Evaluation and Review Technique, is event oriented
Programme Evaluation and Review Technique is not event oriented
Critical Path Method is event oriented
Critical Path method is event oriented
Strict adherence to specifications
Separation of planning and design part
Each individual maintains functional efficiency
All the above
The float may be positive, zero or negative
If the float is positive and the activity is delayed by a period equal to its total float, the completion of project is not delayed
If the float of an activity is negative, delay in its performance is bound to delay the completion of project
All the above
Normal durations for all the activities
Crash durations for all activities
Crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the activities
Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the activities
1
2
3
4
Line organisation
Line and staff organisation
Functional organisation
Effective organisation
Bar chart method
Milestone chart
Critical path method (CPM)
Programme Evaluation and Review Technique (PERT)
Light construction
Heavy construction
Industrial construction
Electrical construction
Activity arrows in a CPM network are drawn to scale
The tail of an arrow represents the finish of an activity
Arrow bead represents the start of an activity
None of the above
Rs. 1740
Rs. 3480
Rs. 5220
Rs. 6960
1, 2, 4, 3, 5
1, 3, 2, 4, 5
1, 2, 3, 4, 5
1, 3, 4, 2, 5
Instructions by the executive engineers
Construction measurements
Issue of store equipments
Names of the casual labour
Normal time
Slow time
Crash time
Standard time
Small projects
Large and complex projects
Research and development projects
Deterministic activities
Event
Float
Duration
Constraint
Is artificially introduced
Is represented by a dotted line
Does not consume time
All the above