Light construction
Heavy construction
Industrial construction
Electrical construction
C. Industrial construction
Its latest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest start time and earliest finish time
Its earliest finish time and earliest start time for its successor activity
The difference of latest occurrence time and earliest expected time, is called slack
The activities connecting the events having zero slack, lie on the critical path
The critical path consumes the maximum time
All the above
Moist loam
Good common earth
Well blasted rock
Wet sticky clay
Is always longest
Is always shortest
May be longest
May be shortest
Unity of command
Effective control at all levels
Delegation of authority
All the above
1, 2 and 3 are correct
1 and 4 are correct
2, 3 and 4 are correct
1, 2 and 4 are correct
The detailed estimated cost based on detailed design
The several alternatives of the project that have been considered
The soil survey, traffic survey, concept design and approximate cost
The contract documents for inviting tenders
3.7 years
4.23 years
5 years
7.87 years
1
2
3
4
EF = ES + D
LS = LF - D
LF = LS + D
All the above
Site located
Foundation is being dug
The office area is being cleaned
The invitations are being sent
Total float and free float
Total float and independent float
Free float and independent float
None of the above
Crash time
Normal time
Optimistic time
Between normal time and crash time
Its earliest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest finish time and earliest start time for its successor activity
Its earliest finish time and latest start time for its successor activity
Minimum
Maximum
Zero
Infinite
Only (i) is correct
(i) and (ii) are correct
(i) and (iii) are correct
(ii) and (iii) are correct
Light construction
Heavy construction
Industrial construction
Electrical construction
3425 kg
5515 kg
4350 kg
2975 kg
The activity is the time consuming part of a project
The beginning and end of a job, are called events
The activity which consumes maximum time, is called a node
Logically and sequentially connected activities and events form a network
The fund for rebuilding a structure when its economic life is over
Raised to meet maintenance costs
The total sum to be paid to the municipal authorities by the tenants
A part of the money kept in reserve for providing additional structures and structural modifications
LST-EST
LFT-EFT
TL-EFT
All the above
(i) and (iii) are correct
(i) and (iv) are correct
(ii) and (iii) are correct
(ii) and (iv) are correct
Resources
Project duration time
Both resources and project duration time
None of the above
Minor works
Major works
Large projects
All the Above
50 %
84.1 %
99.9 %
100 %
3.5 and 5/6
5 and 25/36
3.5 and 25/36
4 and 5/6
Increase in rates of only important materials
Variation in cost in materials element, labour element and petrol-oillubricant element
Variation in total cost of the project on an ad hoc basis
Rate of inflation
The difference between the earliest start time and latest finish time of any activity, is the maximum time available for the activity
The difference between the maximum time available for the job and actual time it consumes, is called total float
The difference between the latest start time and earliest start time of an activity, is called total float
None of these
The float may be positive, zero or negative
If the float is positive and the activity is delayed by a period equal to its total float, the completion of project is not delayed
If the float of an activity is negative, delay in its performance is bound to delay the completion of project
All the above
Acquisition of land
Selection of site
Fmalisation of alignment of work
All the above