Programme Evaluation and Review Technique, is event oriented
Programme Evaluation and Review Technique is not event oriented
Critical Path Method is event oriented
Critical Path method is event oriented
A. Programme Evaluation and Review Technique, is event oriented
Light construction
Heavy construction
Industrial construction
Electrical construction
Earliest start of an activity is the early event time of the node it leaves.
Latest finish of an activity is the late event time of the node it enters.
Latest start of an activity is its latest finish minus its duration.
None of the above
Normal time
Slow time
Crash time
Standard time
Its earliest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest finish time and earliest start time for its successor activity
Its earliest finish time and latest start time for its successor activity
Rs. 31050
Rs. 34500
Rs. 37950
Rs. 50000
Activity arrows in a CPM network are drawn to scale
The tail of an arrow represents the finish of an activity
Arrow bead represents the start of an activity
None of the above
Executive Engineer
Engineer
Junior Engineer
Assistant Engineer
Start float and finish float are always equal.
Total float can be either start float or finish float.
Start float and finish float need not be equal.
Start float and finish float are the differences between activity times and not event times.
Reduce by 200 kg
Increase by 200 kg
Increase by 250 kg
Reduce by 250 kg
Line organisation
Line and staff organisation
Functional organisation
Effective organisation
Identify the activities which can be delayed without affecting the total float of preceding activity
Identify the activities, which can be delayed without affecting the total float of succeeding activity
Establish priorities
Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities
Synthesising in concepts
Is built of activities oriented programme
Is based on time estimate
All the above
Site survey
Availability of construction materials
Availability of labour
All the above
The duration between the earliest start time of the preceding event and latest finish time of the succeeding event, is called 'float'
The duration of time by which an activity can be delayed without affecting the succeeding activity, is called free float
The difference between total float and free float, is called interfering float
All the above
(t1 - t2) - t
t - (t1 - t2)
(t1 + t2) - t
t + (t1 - t2)
Drag line
Hoe
Clam shell
Dipper shovel
Crash time
Normal time
Optimistic time
Standard time
8 days
9 days
10 days
15 days
10000 kg
12500 kg
22500 kg
5000 kg
Bulldozer
Clam shell
Scraper
Dump truck
20 kg/tonne
30 kg/tonne
40 kg/tonne
50 kg/tonne
Moist loam
Good common earth
Well blasted rock
Wet sticky clay
Site investigation started
Sessional work completed
Bus starts from Jaipur
Class is being attended
Greater than earliest event time of the following node
Less than earliest event time of the following node
Less than or equal to earliest event time of the following node
Greater than or equal to earliest event time of the following node
Normal distribution curve
Poisson's distribution curve
Beta distribution curve
None of the above
Measurement of risks to eliminate failures
Applying the theory' of probability to sample testing or inspection
Reduction in wastage of inspection costs
Reduction in costs for the removal of defects
Number of operations
Output of labour
Output of machinery
All the above
2 kg/tonne
6 kg/tonne
9 kg/tonne
20 kg/tonne
Minimum time
Maximum time
Maximum cost
Minimum cost
Small projects
Large and complex projects
Research and development projects
Deterministic activities