A is correct but R is not correct
R is correct but A is not correct
Both A and R is correct
Both A and R is incorrect
A. A is correct but R is not correct
(ii), (iii) and (iv) are correct
(i), (ii) and (iv) are correct
(i), (iii) and (iv) are correct
(i) and (iv) are correct
Bar chart
Gantt chart
Modified Mile stone chart
All the above
On commencement of work at site for payment of loan taken by him
For the purchase of construction materials
For the payment of advances to labour and other staff
For all activities required to start the work at site on finalization of the contract document
1
2
3
4
Concrete
Loose sand
Asphalt
Firm earth
The fund for rebuilding a structure when its economic life is over
Raised to meet maintenance costs
The total sum to be paid to the municipal authorities by the tenants
A part of the money kept in reserve for providing additional structures and structural modifications
Minimum
Maximum
Zero
Infinite
2.3% and 84.1%
97.7% and 84.1%
97.7 % and 15.9%
15.9% and 97.7%
to + 3tm+ tp/3
to + 4tm+ tp/4
to + 4tm+ tp/5
to + 4tm+ tp/6
An engineer
An architect
An owner
All the above
Cheapest critical activity
Cheapest noncritical activity
Costliest critical activity
Costliest noncritical activity
Line organisation
Line and staff organisation
Functional organisation
None of these
Resources
Project duration time
Both resources and project duration time
None of the above
Departmental representative or user
Local civil authority representative
Representative of engineer authority
All the above
8 days
9 days
10 days
15 days
Longest duration
Highest cost slope
Least cost slope
Shortest duration
Assistant Engineer
Executive Engineer
Superintending Engineer
Chief Engineer
Is artificially introduced
Is represented by a dotted line
Does not consume time
All the above
(i) and (iii) are correct
(i) and (iv) are correct
(ii) and (iii) are correct
(ii) and (iv) are correct
EF = ES + D
LS = LF - D
LF = LS + D
All the above
Rigid structure
Extraordinary delay in communications
Top level executions over work
All the above
1880
1900
1920
1940
Programme Evaluation and Review Technique, is event oriented
Programme Evaluation and Review Technique is not event oriented
Critical Path Method is event oriented
Critical Path method is event oriented
Activity of an excavation of a footing
Activity of an excavation which starts at event No. 1 and ends at even No. 2
Activity of excavation which takes 8 units of time
None of these
Line organisation
Line and staff organisation
Functional organisation
Effective organisation
Light construction
Heavy construction
Industrial construction
None of these
50 %
84.1 %
99.9 %
100 %
Activity arrows in a CPM network are drawn to scale
The tail of an arrow represents the finish of an activity
Arrow bead represents the start of an activity
None of the above
An analytic in concept
Limited of event oriented diagrams
Used for research and development projects
All the above
Drag line
Hoe
Clam shell
Dipper shovel