100% at the site
67% at the site and 33% under procurement
50% at the site and 50% under procurement
33% at the site and 67% under procurement
B. 67% at the site and 33% under procurement
Longest duration
Highest cost slope
Least cost slope
Shortest duration
3.5 and 5/6
5 and 25/36
3.5 and 25/36
4 and 5/6
1910
1920
1930
1940
Crash time
Normal time
Optimistic time
Between normal time and crash time
Effective command and control
Rigid discipline in the organisation
Defined responsibilities at all levels
All the above
Free float of the activity must be zero but independent float need not be zero
Independent float must be zero but free float need not be zero
Free float and independent float both must be zero
Free float and independent float both need not be zero
A circle
A square
A triangle
All the above
80 and 90
90 and 80
85 and 75
75 and 83
Optimistic time estimate refers to activities
Pessimistic time estimate refers to activities
Most likely time estimate refers to activities
All the above
Drag line
Hoe
Clam shell
Dipper shovel
50 %
84.1 %
99.9 %
100 %
Event
Node
Connector
All the above
3.7 years
4.23 years
5 years
7.87 years
Light construction
Heavy construction
Industrial construction
None of these
The detailed estimated cost based on detailed design
The several alternatives of the project that have been considered
The soil survey, traffic survey, concept design and approximate cost
The contract documents for inviting tenders
A critical path always begins at the very first event.
A critical path always terminates at the last event.
Critical activities control the project duration.
Critical activity is the one for which free float is zero.
Interdependencies of activities
Project progress
Uncertainties
All of the above
Most likely time
Optimistic time
Pessimistic time
Expected time
500 cum
1000 cum
1500 cum
2000 cum
2.3% and 84.1%
97.7% and 84.1%
97.7 % and 15.9%
15.9% and 97.7%
Shows the interdependencies of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of these
Rs. 4,75,000
Rs. 5,75,000
Rs. 6,50,000
Rs. 8,50,000
Any project
Major projects
Minor projects
All the above
Equal to X
More than X
Less than X
Any of the above
Assistant Engineer
Executive Engineer
Superintending Engineer
Chief Engineer
Earliest start of an activity is the early event time of the node it leaves.
Latest finish of an activity is the late event time of the node it enters.
Latest start of an activity is its latest finish minus its duration.
None of the above
Having a single lump, are called uninodal curves
If symmetrical, are called normal curves
If not symmetrical, are called skew curves
All the above
Bar chart
Gantt chart
Modified Mile stone chart
All the above
Normal durations for all the activities
Crash durations for all activities
Crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the activities
Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the activities
Smooth-wheeled rollers
Vibratory rollers
Sheep foot rollers
Tampers