Drag line
Hoe
Clam shell
Dipper shovel
D. Dipper shovel
Trimming and finishing
Shaping and trimming
Finishing and shaping
Finishing, shaping and trimming
Assistant Engineer
Executive Engineer
Superintending Engineer
Chief Engineer
Site located
Foundation is being dug
The office area is being cleaned
The invitations are being sent
Preparation of specifications
Preparation of estimates
Initiating the procurement action of resources
All the above
Crash time
Normal time
Optimistic time
Standard time
Rs. 8,800
Rs. 7,600
Rs. 6,400
Rs. 5,000
Small projects
Large and complex projects
Research and development projects
Deterministic activities
Preparation of estimate
Survey of the site
Initiation of proposal
Preparation of tender
Planning
Designing
Execution
All the above
Any project
Major projects
Minor projects
All the above
Light construction
Heavy construction
Industrial construction
Electrical construction
Forward pass is used for calculating earliest expected time
Backward pass is used for calculating the latest occurrence time
Maximum value of earliest expected time is used if there is more than one value of any event
All the above
Optimistic time estimate refers to activities
Pessimistic time estimate refers to activities
Most likely time estimate refers to activities
All the above
Kneading
Pressing
Tamping
Vibration
to + 3tm+ tp/3
to + 4tm+ tp/4
to + 4tm+ tp/5
to + 4tm+ tp/6
Site investigation started
Sessional work completed
Bus starts from Jaipur
Class is being attended
Longest duration
Highest cost slope
Least cost slope
Shortest duration
EF = ES + D
LS = LF - D
LF = LS + D
All the above
Identify the activities which can be delayed without affecting the total float of preceding activity
Identify the activities, which can be delayed without affecting the total float of succeeding activity
Establish priorities
Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities
1, 3 and 4 are correct
2, 3 and 4 are correct
1, 2 and 3 are correct
1, 2 and 4 are correct
Moist loam
Sand and gravel
Good common earth
Wet sticky clay
50 %
Less than 50 %
More than 50 %
100 %
Minor works
Major works
Large projects
All the Above
19
14
24
None of these
Earliest start of an activity is the early event time of the node it leaves.
Latest finish of an activity is the late event time of the node it enters.
Latest start of an activity is its latest finish minus its duration.
None of the above
Unity of command
Effective control at all levels
Delegation of authority
All the above
Is always longest
Is always shortest
May be longest
May be shortest
1-2 is 4
2-3 is 7
3-4 is 8
All the above
(ii), (iii) and (iv) are correct
(i), (ii) and (iv) are correct
(i), (iii) and (iv) are correct
(i) and (iv) are correct
Bulldozer
Clam shell
Scraper
Dump truck