Duration
Total float
Free float
Interfering float
Any project
Major projects
Minor projects
All the above
The activity is the time consuming part of a project
The beginning and end of a job, are called events
The activity which consumes maximum time, is called a node
Logically and sequentially connected activities and events form a network
Its latest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest start time and earliest finish time
Its earliest finish time and earliest start time for its successor activity
Light construction
Heavy construction
Industrial construction
Private construction
8 days
9 days
10 days
15 days
Site investigation started
Sessional work completed
Bus starts from Jaipur
Class is being attended
An engineer
An architect
An owner
All the above
1-2 is 4
2-3 is 7
3-4 is 8
All the above
Optimistic time estimate refers to activities
Pessimistic time estimate refers to activities
Most likely time estimate refers to activities
All the above
Line organisation
Line and staff organisation
Functional organisation
None of these
3.7 years
4.23 years
5 years
7.87 years
Unity of command
Effective control at all levels
Delegation of authority
All the above
1, 3, 2, 4
3, 1, 4, 2
3, 1, 2, 4
1, 3, 4, 2
Greater than earliest event time of the following node
Less than earliest event time of the following node
Less than or equal to earliest event time of the following node
Greater than or equal to earliest event time of the following node
To concentrate his attention on critical activities
To divert the resources from non-critical advanced activities to critical activities
To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
All the above
Activity of an excavation of a footing
Activity of an excavation which starts at event No. 1 and ends at even No. 2
Activity of excavation which takes 8 units of time
None of these
Normal distribution curve
Poisson's distribution curve
Beta distribution curve
None of the above
3425 kg
5515 kg
4350 kg
2975 kg
On commencement of work at site for payment of loan taken by him
For the purchase of construction materials
For the payment of advances to labour and other staff
For all activities required to start the work at site on finalization of the contract document
Its earliest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest finish time and earliest start time for its successor activity
Its earliest finish time and latest start time for its successor activity
1, 2 and 4
3, 4 and 5
1, 3 and 4
1, 2 and 5
Bar chart method
Milestone chart
Critical path method (CPM)
Programme Evaluation and Review Technique (PERT)
Drag line
Hoe
Clam shell
Dipper shovel
Smooth-wheeled rollers
Vibratory rollers
Sheep foot rollers
Tampers
Ice
Concrete
Loose sand
Earth
LST-EST
LFT-EFT
TL-EFT
All the above
Emphasis is given to activities
Uncertainties are not allowed
Activities are represented by arrows
All the above
Yes, because of heavier overheads and handling cost
Yes, because of the very high order of quality control for the factory made components
No, because of repetitive manufacture of a number of elements
No, because of savings in site labour
Instructions by the executive engineers
Construction measurements
Issue of store equipments
Names of the casual labour