Rs. 4,75,000
Rs. 5,75,000
Rs. 6,50,000
Rs. 8,50,000
B. Rs. 5,75,000
Is always longest
Is always shortest
May be longest
May be shortest
Site located
Foundation is being dug
The office area is being cleaned
The invitations are being sent
20 kg/tonne
30 kg/tonne
40 kg/tonne
50 kg/tonne
(ii), (iii) and (iv) are correct
(i), (ii) and (iv) are correct
(i), (iii) and (iv) are correct
(i) and (iv) are correct
Normal durations for all the activities
Crash durations for all activities
Crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the activities
Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the activities
Effective command and control
Rigid discipline in the organisation
Defined responsibilities at all levels
All the above
(i) and (iii) are correct
(i) and (iv) are correct
(ii) and (iii) are correct
(ii) and (iv) are correct
Small projects
Large and complex projects
Research and development projects
Deterministic activities
Is an improvement upon bar chart method
Provides a realistic approach to daily problems
Avoids delays which are very common in bar charts
All the above
An activity of a project is denoted by an arrow on the net work
The tail of the arrow indicates the start of the activity
The head of the arrow indicates the end of the activity
The arrows are drawn to scale from left to right
Crash time
Normal time
Optimistic time
Between normal time and crash time
Forward pass is used for calculating earliest expected time
Backward pass is used for calculating the latest occurrence time
Maximum value of earliest expected time is used if there is more than one value of any event
All the above
Unity of command
Effective control at all levels
Delegation of authority
All the above
1 and 4 are correct
2 and 3 are correct
1 and 4 are correct
1 and 2 are correct
Light construction
Heavy construction
Industrial construction
Electrical construction
Start float and finish float are always equal.
Total float can be either start float or finish float.
Start float and finish float need not be equal.
Start float and finish float are the differences between activity times and not event times.
EF = ES + D
LS = LF - D
LF = LS + D
All the above
An activity
An event
Both event and activity
None of the above
Light construction
Heavy construction
Industrial construction
Private construction
Optimistic time estimate refers to activities
Pessimistic time estimate refers to activities
Most likely time estimate refers to activities
All the above
4 days
6 days
10 days
16 days
Preceding activities
Succeeding activities
The particular activity involved
None of the above
On commencement of work at site for payment of loan taken by him
For the purchase of construction materials
For the payment of advances to labour and other staff
For all activities required to start the work at site on finalization of the contract document
Both A and R is true and R is the correct explanation of A
Both A and R is true but R is not the correct explanation of A
A is true but R is false
A is false but R is true
Total float and free float
Total float and independent float
Free float and independent float
None of the above
Measurement of risks to eliminate failures
Applying the theory' of probability to sample testing or inspection
Reduction in wastage of inspection costs
Reduction in costs for the removal of defects
to + 3tm+ tp/3
to + 4tm+ tp/4
to + 4tm+ tp/5
to + 4tm+ tp/6
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
All the above
Synthesising in concepts
Is built of activities oriented programme
Is based on time estimate
All the above
Activity arrows in a CPM network are drawn to scale
The tail of an arrow represents the finish of an activity
Arrow bead represents the start of an activity
None of the above