Bar chart
Gantt chart
Modified Mile stone chart
All the above
D. All the above
Change of critical path
Decrease of project completion time
Increase of project completion time
All of the above
19
14
24
None of these
500 cum
1000 cum
1500 cum
2000 cum
20
25
35
15
Identify the activities which can be delayed without affecting the total float of preceding activity
Identify the activities, which can be delayed without affecting the total float of succeeding activity
Establish priorities
Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities
Increase in rates of only important materials
Variation in cost in materials element, labour element and petrol-oillubricant element
Variation in total cost of the project on an ad hoc basis
Rate of inflation
Digging of foundation started
Digging of foundation completed
Laying of concrete started
All the above
100% at the site
67% at the site and 33% under procurement
50% at the site and 50% under procurement
33% at the site and 67% under procurement
50 %
Less than 50 %
More than 50 %
100 %
Rigid structure
Extraordinary delay in communications
Top level executions over work
All the above
Shows the interdependencies of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of these
Determines the status of each activity
Adjusts automatically changes in activity progress
Is a dynamic system
None of these
Controlling the total quantity at each batch
Weighing accurately, the quantity of each material for a job before mixing
Controlling the quantity of each material into each batch
Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
Acquisition of land
Selection of site
Fmalisation of alignment of work
All the above
1 and 4 are correct
2 and 3 are correct
1 and 4 are correct
1 and 2 are correct
Total float and free float
Total float and independent float
Free float and independent float
None of the above
Vertical lines
Horizontal lines
Dots
Crosses
(i) and (iii) are correct
(i) and (iv) are correct
(ii) and (iii) are correct
(ii) and (iv) are correct
Hoe
Shovel
Dragline
None of the above
Bar chart method
Milestone chart
Critical path method (CPM)
Programme Evaluation and Review Technique (PERT)
Emphasis is given to activities
Uncertainties are not allowed
Activities are represented by arrows
All the above
The fund for rebuilding a structure when its economic life is over
Raised to meet maintenance costs
The total sum to be paid to the municipal authorities by the tenants
A part of the money kept in reserve for providing additional structures and structural modifications
Maximum float
Minimum float
Zero float
None of these
1
2
3
4
Rs. 31050
Rs. 34500
Rs. 37950
Rs. 50000
Minimum time
Maximum time
Maximum cost
Minimum cost
Smooth-wheeled rollers
Vibratory rollers
Sheep foot rollers
Tampers
The duration between the earliest start time of the preceding event and latest finish time of the succeeding event, is called 'float'
The duration of time by which an activity can be delayed without affecting the succeeding activity, is called free float
The difference between total float and free float, is called interfering float
All the above
Greater than earliest event time of the following node
Less than earliest event time of the following node
Less than or equal to earliest event time of the following node
Greater than or equal to earliest event time of the following node
Executive Engineer
Engineer
Junior Engineer
Assistant Engineer