To concentrate his attention on critical activities
To divert the resources from non-critical advanced activities to critical activities
To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
All the above
Number of operations
Output of labour
Output of machinery
All the above
Event
Node
Connector
All the above
1880
1900
1920
1940
Both A and R is true and R is the correct explanation of A
Both A and R is true but R is not the correct explanation of A
A is true but R is false
A is false but R is true
3.7 years
4.23 years
5 years
7.87 years
Drag line
Hoe
Clam shell
Dipper shovel
Preceding activities
Succeeding activities
The particular activity involved
None of the above
The various functions under each activity, are shown by one bar on Bar Charts
Bar chart establishes the interdependency of one event on another
Only approximate percentage of the completed work is reported
None of these
Moist loam
Good common earth
Well blasted rock
Wet sticky clay
Reduce by 200 kg
Increase by 200 kg
Increase by 250 kg
Reduce by 250 kg
Earliest expected time is denoted by TE
Latest occurrence time is denoted by TL
Contractual obligation time is denoted by Ts
All the above
Determines the status of each activity
Adjusts automatically changes in activity progress
Is a dynamic system
None of these
Free float of the activity must be zero but independent float need not be zero
Independent float must be zero but free float need not be zero
Free float and independent float both must be zero
Free float and independent float both need not be zero
Unity of command
Effective control at all levels
Delegation of authority
All the above
Controlling the total quantity at each batch
Weighing accurately, the quantity of each material for a job before mixing
Controlling the quantity of each material into each batch
Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
Normal durations for all the activities
Crash durations for all activities
Crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the activities
Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the activities
Event flow scheduling technique
Critical ratio scheduling
Slotting technique for scheduling
Short interval scheduling
Optimistic time
Pessimistic time
Most likely time
All the above
Light construction
Heavy construction
Industrial construction
Private construction
Greater than earliest event time of the following node
Less than earliest event time of the following node
Less than or equal to earliest event time of the following node
Greater than or equal to earliest event time of the following node
1, 3 and 4 are correct
2, 3 and 4 are correct
1, 2 and 3 are correct
1, 2 and 4 are correct
Effective command and control
Rigid discipline in the organisation
Defined responsibilities at all levels
All the above
Is artificially introduced
Is represented by a dotted line
Does not consume time
All the above
Started 5 days later
Completed 5 days later
Performed at slower rate in 15 days
All the above
Forward pass is used for calculating earliest expected time
Backward pass is used for calculating the latest occurrence time
Maximum value of earliest expected time is used if there is more than one value of any event
All the above
Programme Evaluation and Review Technique, is event oriented
Programme Evaluation and Review Technique is not event oriented
Critical Path Method is event oriented
Critical Path method is event oriented
1, 2 and 3 are correct
1 and 4 are correct
2, 3 and 4 are correct
1, 2 and 4 are correct
EF = ES + D
LS = LF - D
LF = LS + D
All the above