Greater than earliest event time of the following node
Less than earliest event time of the following node
Less than or equal to earliest event time of the following node
Greater than or equal to earliest event time of the following node
C. Less than or equal to earliest event time of the following node
Vertical lines
Horizontal lines
Dots
Crosses
Event flow scheduling technique
Critical ratio scheduling
Slotting technique for scheduling
Short interval scheduling
Ice
Concrete
Loose sand
Earth
Assistant Engineer
Executive Engineer
Superintending Engineer
Chief Engineer
Acquisition of land
Selection of site
Fmalisation of alignment of work
All the above
An engineer
An architect
An owner
All the above
Concrete cured
Fixing of door
Plastering of walls
Selecting sites
Rigid structure
Extraordinary delay in communications
Top level executions over work
All the above
Positive
Negative
Zero
Same
19
14
24
None of these
Emphasis is given to activities
Uncertainties are not allowed
Activities are represented by arrows
All the above
Crash time
Normal time
Optimistic time
Standard time
1 and 4 are correct
2 and 3 are correct
1 and 4 are correct
1 and 2 are correct
Site investigation started
Sessional work completed
Bus starts from Jaipur
Class is being attended
(i), (ii) and (iv) are correct
(ii), (iii) and (iv) are correct
(i), (iii) and (iv) are correct
(i), (ii) and (iii) are correct
Equal to X
More than X
Less than X
Any of the above
Its latest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest start time and earliest finish time
Its earliest finish time and earliest start time for its successor activity
Event
Dummy
Duration
Float
Resources
Project duration time
Both resources and project duration time
None of the above
10000 kg
12500 kg
22500 kg
5000 kg
20 kg/tonne
30 kg/tonne
40 kg/tonne
50 kg/tonne
80 and 90
90 and 80
85 and 75
75 and 83
Controlling the total quantity at each batch
Weighing accurately, the quantity of each material for a job before mixing
Controlling the quantity of each material into each batch
Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
The activity is the time consuming part of a project
The beginning and end of a job, are called events
The activity which consumes maximum time, is called a node
Logically and sequentially connected activities and events form a network
Change of critical path
Decrease of project completion time
Increase of project completion time
All of the above
Dummy
Event
Activity
Contract
Normal durations for all the activities
Crash durations for all activities
Crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the activities
Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the activities
Kneading
Pressing
Tamping
Vibration
The latest occurrence time of the node of which the activity arrow terminates minus the duration of the activity, is called latest start time
The latest occurrence time for the node at which the activity arrow terminates, is called latest finish time
Earliest occurrence time of the event from which the activity arrow' originates, is called earliest start time of the activity
All the above
(t1 - t2) - t
t - (t1 - t2)
(t1 + t2) - t
t + (t1 - t2)