Positive
Negative
Zero
Same
C. Zero
Event
Float
Duration
Constraint
A person
A firm
An agency
All the above
An engineer
An architect
An owner
All the above
2 kg/tonne
6 kg/tonne
9 kg/tonne
20 kg/tonne
Rs. 8,800
Rs. 7,600
Rs. 6,400
Rs. 5,000
Light construction
Heavy construction
Industrial construction
Electrical construction
Bar chart
Gantt chart
Modified Mile stone chart
All the above
(i), (ii) and (iv) are correct
(ii), (iii) and (iv) are correct
(i), (iii) and (iv) are correct
(i), (ii) and (iii) are correct
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
All the above
Start float and finish float are always equal.
Total float can be either start float or finish float.
Start float and finish float need not be equal.
Start float and finish float are the differences between activity times and not event times.
Change of critical path
Decrease of project completion time
Increase of project completion time
All of the above
Shows the interdependencies of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of these
Duration
Total float
Free float
Interfering float
Hoe
Shovel
Dragline
None of the above
Activity arrows in a CPM network are drawn to scale
The tail of an arrow represents the finish of an activity
Arrow bead represents the start of an activity
None of the above
Crash time
Normal time
Optimistic time
Between normal time and crash time
500 cum
1000 cum
1500 cum
2000 cum
Having a single lump, are called uninodal curves
If symmetrical, are called normal curves
If not symmetrical, are called skew curves
All the above
The activity is the time consuming part of a project
The beginning and end of a job, are called events
The activity which consumes maximum time, is called a node
Logically and sequentially connected activities and events form a network
Moist loam
Good common earth
Well blasted rock
Wet sticky clay
Free float of the activity must be zero but independent float need not be zero
Independent float must be zero but free float need not be zero
Free float and independent float both must be zero
Free float and independent float both need not be zero
8 days
9 days
10 days
15 days
Any project
Major projects
Minor projects
All the above
Optimistic time estimate refers to activities
Pessimistic time estimate refers to activities
Most likely time estimate refers to activities
All the above
Its latest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest start time and earliest finish time
Its earliest finish time and earliest start time for its successor activity
Event
Free float
Dummy
Constraint
CPM analysis is activity oriented
PERT analysis is event oriented
In CPM, the time is related to cost
All the above
Acquisition of land
Selection of site
Fmalisation of alignment of work
All the above
Is always longest
Is always shortest
May be longest
May be shortest
Minimum
Maximum
Zero
Infinite