Controlling the total quantity at each batch
Weighing accurately, the quantity of each material for a job before mixing
Controlling the quantity of each material into each batch
Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
C. Controlling the quantity of each material into each batch
Kneading
Pressing
Tamping
Vibration
(i) and (iii) are correct
(i) and (iv) are correct
(ii) and (iii) are correct
(ii) and (iv) are correct
The detailed estimated cost based on detailed design
The several alternatives of the project that have been considered
The soil survey, traffic survey, concept design and approximate cost
The contract documents for inviting tenders
Normal distribution curve
Poisson's distribution curve
Beta distribution curve
None of the above
Planning
Designing
Execution
All the above
Digging of foundation started
Digging of foundation completed
Laying of concrete started
All the above
Determines the status of each activity
Adjusts automatically changes in activity progress
Is a dynamic system
None of these
Preparation of specifications
Preparation of estimates
Initiating the procurement action of resources
All the above
An activity of a project is denoted by an arrow on the net work
The tail of the arrow indicates the start of the activity
The head of the arrow indicates the end of the activity
The arrows are drawn to scale from left to right
Site located
Foundation is being dug
The office area is being cleaned
The invitations are being sent
The activity is the time consuming part of a project
The beginning and end of a job, are called events
The activity which consumes maximum time, is called a node
Logically and sequentially connected activities and events form a network
Drag line
Hoe
Clam shell
Dipper shovel
A is correct but R is not correct
R is correct but A is not correct
Both A and R is correct
Both A and R is incorrect
Minor works
Major works
Large projects
All the Above
Earliest expected time is denoted by TE
Latest occurrence time is denoted by TL
Contractual obligation time is denoted by Ts
All the above
Departmental representative or user
Local civil authority representative
Representative of engineer authority
All the above
Line organisation
Line and staff organisation
Functional organisation
Effective organisation
10000 kg
12500 kg
22500 kg
5000 kg
Bar chart
Gantt chart
Modified Mile stone chart
All the above
Interdependencies of activities
Project progress
Uncertainties
All of the above
The difference of latest occurrence time and earliest expected time, is called slack
The activities connecting the events having zero slack, lie on the critical path
The critical path consumes the maximum time
All the above
Bulldozer
Clam shell
Scraper
Dump truck
Identify the activities which can be delayed without affecting the total float of preceding activity
Identify the activities, which can be delayed without affecting the total float of succeeding activity
Establish priorities
Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities
Rs. 8,800
Rs. 7,600
Rs. 6,400
Rs. 5,000
Activity arrows in a CPM network are drawn to scale
The tail of an arrow represents the finish of an activity
Arrow bead represents the start of an activity
None of the above
Concrete cured
Fixing of door
Plastering of walls
Selecting sites
Event
Dummy
Duration
Float
Should invest in neither of the two projects
Could invest in either of the two projects
Should invest in project A
Should invest in project B
An analytic in concept
Limited of event oriented diagrams
Used for research and development projects
All the above
1, 2 and 3 are correct
1 and 4 are correct
2, 3 and 4 are correct
1, 2 and 4 are correct