Synthesising in concepts
Is built of activities oriented programme
Is based on time estimate
All the above
D. All the above
Small projects
Large and complex projects
Research and development projects
Deterministic activities
Number of operations
Output of labour
Output of machinery
All the above
Reduce by 200 kg
Increase by 200 kg
Increase by 250 kg
Reduce by 250 kg
Drag line
Hoe
Clam shell
Dipper shovel
Its earliest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest finish time and earliest start time for its successor activity
Its earliest finish time and latest start time for its successor activity
Event
Free float
Dummy
Constraint
Started 5 days later
Completed 5 days later
Performed at slower rate in 15 days
All the above
Hoe
Shovel
Dragline
None of the above
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
All the above
Line organisation
Line and staff organisation
Functional organisation
Effective organisation
Kneading
Pressing
Tamping
Vibration
Concrete cured
Fixing of door
Plastering of walls
Selecting sites
Shows the interdependencies of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of these
19
14
24
None of these
The latest occurrence time of the node of which the activity arrow terminates minus the duration of the activity, is called latest start time
The latest occurrence time for the node at which the activity arrow terminates, is called latest finish time
Earliest occurrence time of the event from which the activity arrow' originates, is called earliest start time of the activity
All the above
Rigid structure
Extraordinary delay in communications
Top level executions over work
All the above
3.7 years
4.23 years
5 years
7.87 years
Bulldozer
Clam shell
Scraper
Dump truck
Is always longest
Is always shortest
May be longest
May be shortest
Controlling the total quantity at each batch
Weighing accurately, the quantity of each material for a job before mixing
Controlling the quantity of each material into each batch
Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
Assistant Engineer
Executive Engineer
Superintending Engineer
Chief Engineer
Most likely time
Optimistic time
Pessimistic time
Expected time
Resources
Project duration time
Both resources and project duration time
None of the above
Having a single lump, are called uninodal curves
If symmetrical, are called normal curves
If not symmetrical, are called skew curves
All the above
Drag line
Hoe
Clam shell
Dipper shovel
1, 3 and 4 are correct
2, 3 and 4 are correct
1, 2 and 3 are correct
1, 2 and 4 are correct
8 days
9 days
10 days
15 days
50 %
84.1 %
99.9 %
100 %
1 and 4 are correct
2 and 3 are correct
1 and 4 are correct
1 and 2 are correct
1, 2 and 4
3, 4 and 5
1, 3 and 4
1, 2 and 5