Minimum
Maximum
Zero
Infinite
A. Minimum
Event
Float
Duration
Constraint
1-2 is 4
2-3 is 7
3-4 is 8
All the above
Free float of the activity must be zero but independent float need not be zero
Independent float must be zero but free float need not be zero
Free float and independent float both must be zero
Free float and independent float both need not be zero
Its latest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest start time and earliest finish time
Its earliest finish time and earliest start time for its successor activity
Executive Engineer
Engineer
Junior Engineer
Assistant Engineer
Earliest start of an activity is the early event time of the node it leaves.
Latest finish of an activity is the late event time of the node it enters.
Latest start of an activity is its latest finish minus its duration.
None of the above
Assistant Engineer
Executive Engineer
Superintending Engineer
Chief Engineer
Maximum float
Minimum float
Zero float
None of these
CPM analysis is activity oriented
PERT analysis is event oriented
In CPM, the time is related to cost
All the above
Forward pass is used for calculating earliest expected time
Backward pass is used for calculating the latest occurrence time
Maximum value of earliest expected time is used if there is more than one value of any event
All the above
Interdependencies of activities
Project progress
Uncertainties
All of the above
Drag line
Hoe
Clam shell
Dipper shovel
Light construction
Heavy construction
Industrial construction
None of these
50 %
Less than 50 %
More than 50 %
100 %
Moist loam
Good common earth
Well blasted rock
Wet sticky clay
Event flow scheduling technique
Critical ratio scheduling
Slotting technique for scheduling
Short interval scheduling
1880
1900
1920
1940
2 kg/tonne
6 kg/tonne
9 kg/tonne
20 kg/tonne
Total float
Free float
Interfering float
Independent float
Emphasis is given to activities
Uncertainties are not allowed
Activities are represented by arrows
All the above
To concentrate his attention on critical activities
To divert the resources from non-critical advanced activities to critical activities
To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
All the above
Event
Free float
Dummy
Constraint
Concrete
Loose sand
Asphalt
Firm earth
8 days
9 days
10 days
15 days
Only (i) is correct
(i) and (ii) are correct
(i) and (iii) are correct
(ii) and (iii) are correct
A is correct but R is not correct
R is correct but A is not correct
Both A and R is correct
Both A and R is incorrect
(ii), (iii) and (iv) are correct
(i), (ii) and (iv) are correct
(i), (iii) and (iv) are correct
(i) and (iv) are correct
1, 2, 4, 3, 5
1, 3, 2, 4, 5
1, 2, 3, 4, 5
1, 3, 4, 2, 5
Any project
Major projects
Minor projects
All the above
An analytic in concept
Limited of event oriented diagrams
Used for research and development projects
All the above