Home
Current Affairs January 2024

What is the correct answer?

4

Switches and relays should be shown in this position with no operating force or applied energy:

A. Normal

B. Closed

C. Offset

D. Application

Correct Answer :

A. Normal


Related Questions

What is the correct answer?

4

In isometric projection, all distances are approximately this percentage of their true size:

A. 120 percent

B. 80 percent

C. 50 percent

D. 20 percent

What is the correct answer?

4

These units are based on inch-foot and yard measurements:

A. International customary units

B. U.S. metric units

C. U.S. customary units

D. ISO international units

What is the correct answer?

4

In architectural drawing ________ are often used to illustrate and detail structural components.

A. Foundation beam detail sections

B. Wall sections

C. Building sections

D. All of the above

What is the correct answer?

4

Objects that are symmetric can be shown effectively using this type of section:

A. Quarter section

B. Half section

C. Full section

D. Symmetric section

What is the correct answer?

4

The Press-Pull tool will ________ the face of a solid model in the direction it faces.

A. Taper

B. Extrude

C. Spiral

D. None of the above

What is the correct answer?

4

A projection weld is a type of:

A. Resistance weld

B. Arc weld

C. Gas weld

D. Fillet weld

What is the correct answer?

4

When filling an area with a hatch pattern in Auto-CAD the drafter needs to be able to ________.

A. See the entire bounding area to hatch

B. Set Ortho on

C. Turn ISO grid off

D. Set the layer to Defpoints

What is the correct answer?

4

The text used on a typical detail sheet should be ________.

A. Placed horizontally

B. In bold text

C. In an architectural text style

D. None of the above

What is the correct answer?

4

In perspective drawings this is placed between the observer and the object:

A. Vanishing point / horizon

B. Station point

C. Ground line

D. Plane of projection / picture plane

What is the correct answer?

4

These are used to attach parts to a cylinder so they won't turn on it:

A. Lugs and bearings

B. Key-seats and bearings

C. Knurls and keys

D. Keys and keyways/key-seats

What is the correct answer?

4

When the receding lines are true length, and the projectors are at 45 degrees to the plane of projection, the oblique drawing is called this:

A. Cabinet projection

B. Cavalier projection

C. Axonometric projection

D. Isometric projection

What is the correct answer?

4

When creating a Cutting Plane line with Auto-CAD it is customary to use a ________ to create the line.

A. Center line

B. Polyline

C. Dashed line

D. Hatch line

What is the correct answer?

4

These are joined together in the field to build a structure:

A. Riveted members

B. Main members

C. Steel fabrications

D. Assembled fabrications

What is the correct answer?

4

The ________ tool on the Dimension tool bar will place several dimensions at one time by using a selection box placed over several part features.

A. Linear

B. Continue

C. Baseline

D. Quick Dimension

What is the correct answer?

4

One critical issue drafters need to pay close attention to is the ________.

A. Size of the sheet

B. Designer's intent

C. Scale factor

D. None of the above

What is the correct answer?

4

In an oblique drawing, equally spaced partial circles may be used to show this:

A. Symbolic thread pitch

B. Ellipses

C. Cavalier drawings

D. Projection points

What is the correct answer?

4

The bounding box method for setting up an isometric drawing helps the drafter ________.

A. Confine the isometric drawing to its maximum size

B. Figure what lines are to be illustrated vertical and horizontal

C. Position the isometric drawing in paper space

D. None of the above

What is the correct answer?

4

Dimension text is generally placed above the ________ line.

A. Dimension

B. Extension

C. Center

D. Leader

What is the correct answer?

4

The title block used on working drawings should include the __________.

A. Sheet number

B. Line type

C. Layer set

D. All of the above

What is the correct answer?

4

If designs require changes, they should be documented with:

A. Development plans

B. Product proposals

C. Document reviews

D. Engineering change orders

What is the correct answer?

4

EDM is the acronym for:

A. Enterprise data management

B. Engineering drawing management

C. Enterprise drawing manipulation

D. Engineering data manipulation

What is the correct answer?

4

Several of the tools used in traditional drafting include the following:

A. Parallel straight edge

B. 45 degree triangle

C. Circle template

D. All of the above

What is the correct answer?

4

An oil refinery relies on which type of drafter to maintain and update the technical piping drawings used for the construction and maintenance of the facility.

A. Architectural

B. Civil

C. Process piping

D. Electrical

What is the correct answer?

4

Students can complete an associate's degree in drafting which normally takes about ________ years to complete.

A. One

B. Two

C. Three

D. Four

What is the correct answer?

4

This is the measured size of a finished part:

A. Actual size

B. Dimensioned size

C. Production size

D. Basic size

What is the correct answer?

4

This is the bottom surface joining the sides of two adjacent threads:

A. Lead

B. Pitch

C. Crest

D. Root

What is the correct answer?

4

The building construction industry relies on sets of ________ drawings to construct homes and commercial buildings.

A. Mechanical

B. Isometric

C. Architectural working

D. All of the above

What is the correct answer?

4

The maximum and minimum sizes of a feature are identified by a ________ tolerance.

A. Limits

B. GD&T

C. Reference

D. Allowance

What is the correct answer?

4

Architectural drawings used to construct a house are often plotted with a scale of ¼ = 1'-0. What scale is this?

A. Quarter

B. Half

C. Full

D. Double

What is the correct answer?

4

These plans, made by the steel fabricator, are assembly drawings for the steel structure:

A. Welding plans

B. Assembly plans

C. Construction plans

D. Erection plans