Home
Current Affairs January 2024

What is the correct answer?

4

Several of the tools used in traditional drafting include the following:

A. Parallel straight edge

B. 45 degree triangle

C. Circle template

D. All of the above

Correct Answer :

D. All of the above


Related Questions

What is the correct answer?

4

When filling an area with a hatch pattern in Auto-CAD the drafter needs to be able to ________.

A. See the entire bounding area to hatch

B. Set Ortho on

C. Turn ISO grid off

D. Set the layer to Defpoints

What is the correct answer?

4

This practice considers an individual part's dimensions and tolerances and that part's relation to its related parts:

A. Applying allowances

B. Geometric dimensioning and tolerancing

C. Creating datum references

D. Angular dimensioning tolerances

What is the correct answer?

4

One way to evenly space dimensions on a drawing is to use the ________.

A. Dimension Space tool

B. Linear tool

C. Continue tool

D. Baseline tool

What is the correct answer?

4

This type of rapid prototyping system uses a laser to fuse powdered metals, plastics, or ceramics:

A. Fused deposition modeling

B. Stereo lithography apparatus

C. Solid ground curing

D. Selective laser sintering

What is the correct answer?

4

This is the intersection of the ground plane with the picture plane:

A. Vanishing point

B. Ground line

C. Station point

D. Horizon

What is the correct answer?

4

An advantage of this type of view is that each view shows the object all the way through as if it were transparent:

A. Planar

B. Horizontal

C. Auxiliary

D. Orthographic

What is the correct answer?

4

On a floor plan the dashed line that appears approximately 24 outside the exterior wall represents the __________.

A. Sidewalk

B. Roof overhang

C. Plumbing drain lines

D. None of the above

What is the correct answer?

4

An oil refinery relies on which type of drafter to maintain and update the technical piping drawings used for the construction and maintenance of the facility.

A. Architectural

B. Civil

C. Process piping

D. Electrical

What is the correct answer?

4

When using versions of Auto-CAD prior to Release 2006 it may be necessary to ________ a block in order to edit it.

A. Copy

B. Explode

C. Offset

D. None of the above

What is the correct answer?

4

A round is a rounded surface on the ________ corner of a part.

A. Inside

B. Outside

C. Radial

D. Isoplane

What is the correct answer?

4

The text used on a typical detail sheet should be ________.

A. Placed horizontally

B. In bold text

C. In an architectural text style

D. None of the above

What is the correct answer?

4

This type of circuit is a semiconductor wafer or chip:

A. Integrated circuit

B. Transmission circuit

C. Plotted circuit

D. Conducted circuit

What is the correct answer?

4

This is the plane upon which the top view is projected:

A. Horizontal

B. Frontal

C. Profile

D. Base

What is the correct answer?

4

Oblique sections are useful to show this:

A. Foreshortened features

B. Oblique lines

C. Interior shapes

D. Projected features

What is the correct answer?

4

An accurate record of changes made to release drawings is tracked via this:

A. A revision block

B. The basic title form

C. Working drawings

D. Portable documents

What is the correct answer?

4

If a plane is parallel to the plane of projection, it appears:

A. True size

B. As a line or edge

C. Foreshortened

D. As an oblique surface

What is the correct answer?

4

This process recognizes the inherent interrelationships between design and manufacturing:

A. Design for manufacture

B. Design for manufacture and assembly

C. Design for concurrent engineering

D. Design for assembly

What is the correct answer?

4

In some circumstances an entire drawing can be inserted into a different drawing as a block. When this is used the base point will default to ________.

A. 0, 0

B. 10, 10

C. 20, 20

D. 30, 30

What is the correct answer?

4

CAD programs which incorporate parametric modeling utilize a system in which the dimensions control the ________.

A. Size and shape of the model features

B. Perspective of the model

C. Shading used to render the model

D. All of the above

What is the correct answer?

4

Three dimensional models are often used in the design process to __________.

A. Help the client understand the overall design concept

B. Help the client select a color for their carpet

C. Provide the client with a model which they can use to impress their friends

D. Determine the quantity of brick needed to build the house

What is the correct answer?

4

By using a ________ section of a cylindrical mechanical part the drafter should be able to show only one view of the part.

A. Half

B. Whole

C. Revolved

D. Broken out

What is the correct answer?

4

In this type of auxiliary view, a break line is used to indicate the imaginary break in the views:

A. Primary

B. Secondary

C. Revolved

D. Partial

What is the correct answer?

4

The daily workload of a ________ drafter would generally include technical drawings of machine parts.

A. Architectural

B. Civil

C. Electrical

D. Mechanical

What is the correct answer?

4

A typical set of mechanical working drawings includes ________.

A. Exploded assembly

B. Part details

C. Parts list

D. All of the above

What is the correct answer?

4

In developing a multi-view drawing, the drafter can use a ________ line to help locate the top and right side views.

A. Object

B. Hidden

C. Dimension

D. Miter

What is the correct answer?

4

A projection weld is a type of:

A. Resistance weld

B. Arc weld

C. Gas weld

D. Fillet weld

What is the correct answer?

4

The second line of dimensions out from the plan generally includes ________.

A. Centers of doors and windows

B. The distances between outside walls and interior walls

C. The measurement from the outside of the brick to the inside of the exterior wall

D. The measurement from one outside corner to the opposite outside corner

What is the correct answer?

4

In an assembly section, these parts should have their section lines left out or shown solid black:

A. Bolts

B. All fasteners

C. Thin parts

D. Rivets

What is the correct answer?

4

Before starting an isometric drawing in Auto-CAD the drafter needs to ________.

A. Set the grid to isometric

B. Set the current layer to Defpoints

C. Turn Object Snap off

D. Turn Ortho off

What is the correct answer?

4

These are joined together in the field to build a structure:

A. Riveted members

B. Main members

C. Steel fabrications

D. Assembled fabrications