Maximum float
Minimum float
Zero float
None of these
C. Zero float
Is artificially introduced
Is represented by a dotted line
Does not consume time
All the above
A person
A firm
An agency
All the above
A circle
A square
A triangle
All the above
100% at the site
67% at the site and 33% under procurement
50% at the site and 50% under procurement
33% at the site and 67% under procurement
1, 3 and 4 are correct
2, 3 and 4 are correct
1, 2 and 3 are correct
1, 2 and 4 are correct
Free float of the activity must be zero but independent float need not be zero
Independent float must be zero but free float need not be zero
Free float and independent float both must be zero
Free float and independent float both need not be zero
Both A and R is true and R is the correct explanation of A
Both A and R is true but R is not the correct explanation of A
A is true but R is false
A is false but R is true
Rigid structure
Extraordinary delay in communications
Top level executions over work
All the above
Controlling the total quantity at each batch
Weighing accurately, the quantity of each material for a job before mixing
Controlling the quantity of each material into each batch
Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
Increase in rates of only important materials
Variation in cost in materials element, labour element and petrol-oillubricant element
Variation in total cost of the project on an ad hoc basis
Rate of inflation
Rs. 1740
Rs. 3480
Rs. 5220
Rs. 6960
EF = ES + D
LS = LF - D
LF = LS + D
All the above
Total float and free float
Total float and independent float
Free float and independent float
None of the above
The activity is the time consuming part of a project
The beginning and end of a job, are called events
The activity which consumes maximum time, is called a node
Logically and sequentially connected activities and events form a network
Forward pass is used for calculating earliest expected time
Backward pass is used for calculating the latest occurrence time
Maximum value of earliest expected time is used if there is more than one value of any event
All the above
Total float
Free float
Interfering float
Independent float
Its earliest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest finish time and earliest start time for its successor activity
Its earliest finish time and latest start time for its successor activity
Resource levelling
Resource smoothening
Updating
Critical path scheduling
Should invest in neither of the two projects
Could invest in either of the two projects
Should invest in project A
Should invest in project B
Ice
Concrete
Loose sand
Earth
The difference between the earliest start time and latest finish time of any activity, is the maximum time available for the activity
The difference between the maximum time available for the job and actual time it consumes, is called total float
The difference between the latest start time and earliest start time of an activity, is called total float
None of these
Kneading
Pressing
Tamping
Vibration
Drag line
Hoe
Clam shell
Dipper shovel
Planning
Designing
Execution
All the above
(a + m + b)/6
(a + 2m + b)/6
(a + 4m + b)/6
(a + 5m + b)/6
Event
Dummy
Duration
Float
Preceding activities
Succeeding activities
The particular activity involved
None of the above
Small projects
Large and complex projects
Research and development projects
Deterministic activities
10000 kg
12500 kg
22500 kg
5000 kg
Line organisation
Line and staff organisation
Functional organisation
None of these