What is the correct answer?
4
Once the architect has finalized the house plans with the client any changes to the design requested by the client will require a ________.
C. Whole new set of drawings
What is the correct answer?
4
A ________ is the person responsible for verifying that the drawings in a project set are free of mistakes.
What is the correct answer?
4
The Free Orbit tool is found on the ________ toolbar.
What is the correct answer?
4
If designs require changes, they should be documented with:
D. Engineering change orders
What is the correct answer?
4
This process recognizes the inherent interrelationships between design and manufacturing:
A. Design for manufacture
B. Design for manufacture and assembly
C. Design for concurrent engineering
What is the correct answer?
4
The ________ dimension tool will place the length of an angled line.
What is the correct answer?
4
This should show what changes were made, when, and by whom:
What is the correct answer?
4
This is a systematic approach that integrates the design and manufacture of products with the goal of optimizing the process:
A. Traditional engineering design
B. The manufacturing process
What is the correct answer?
4
The View toolbar will position the view of the 3-D solid toward the ________.
What is the correct answer?
4
PDM is the acronym for:
A. Project drawing management
B. Product drawing manipulation
C. Product data management
D. Project data manipulation
What is the correct answer?
4
A projection weld is a type of:
What is the correct answer?
4
When adding dimensions to an auxiliary view it will be necessary to use the ________ tool.
What is the correct answer?
4
Which of the following is one of the basic types of welded joints:
What is the correct answer?
4
The most common geometric form used in gears today is this:
What is the correct answer?
4
A fillet is a rounded surface on the ________ corner of a part.
What is the correct answer?
4
Some of the standard Auto-CAD text styles used in architectural drawings includes ________.
What is the correct answer?
4
In this type of projection, each of the axes has different ratios of foreshortening:
What is the correct answer?
4
The organized and orderly approach to solving problems is known as the:
What is the correct answer?
4
A partial auxiliary view is used to show only the ________ in the auxiliary view.
A. Projected inclined plane
B. The projected top view
C. The projected side view
What is the correct answer?
4
Architectural drawings used to construct a house are often plotted with a scale of ¼ = 1'-0. What scale is this?
What is the correct answer?
4
In the mechanical design process the first step is to ________.
B. Prepare rough sketches
What is the correct answer?
4
This is the most common application for developments and intersections:
A. Sheet metal construction
D. Mechanical engineering
What is the correct answer?
4
When creating your own blocks it is important to avoid drawing any portion of the block in the ________ layer.
What is the correct answer?
4
This is how axonometric, oblique, and perspective sketches show objects:
What is the correct answer?
4
An oil refinery relies on which type of drafter to maintain and update the technical piping drawings used for the construction and maintenance of the facility.
What is the correct answer?
4
In multi-view drawing it is common practice to include three views, the front, the top and the right side. If no dimensions are required on the right side view the drafter can ________.
C. Use the left view instead
What is the correct answer?
4
The standard number of threads per inch for various diameters is the:
What is the correct answer?
4
This type of drawing shows two lines representing the pipe diameter:
What is the correct answer?
4
Using this as a communication and design review tool can help shorten the process and eliminate productivity barriers:
B. Portable document files
C. The Internet and e-mail
What is the correct answer?
4
In this type of concrete, the steel is pre-tensioned before the superimposed load is applied: