Home
Current Affairs January 2024

What is the correct answer?

4

The condition of a part when it contains the least amount of material is referred to as ________.

A. Smallest

B. LMC

C. MMC

D. Actual size

Correct Answer :

B. LMC


Related Questions

What is the correct answer?

4

An architect often relies on a ________ to complete the set of technical drawings used in the design of an office building.

A. Technical illustrator

B. Artist

C. Drafter

D. Construction superintendent

What is the correct answer?

4

When using versions of Auto-CAD prior to Release 2006 it may be necessary to ________ a block in order to edit it.

A. Copy

B. Explode

C. Offset

D. None of the above

What is the correct answer?

4

The Free Orbit tool is found on the ________ toolbar.

A. Rotate

B. Move

C. Modify

D. 3-D Move

What is the correct answer?

4

A secondary auxiliary view is a projection off of the ________.

A. Front view

B. Top view

C. Primary auxiliary view

D. None of the above

What is the correct answer?

4

Before starting an isometric drawing in Auto-CAD the drafter needs to ________.

A. Set the grid to isometric

B. Set the current layer to Defpoints

C. Turn Object Snap off

D. Turn Ortho off

What is the correct answer?

4

This type of drawing is created to calculate areas, locate property lines, and locate building projects and facilities:

A. Traverse

B. Contour

C. City map

D. Plat

What is the correct answer?

4

The daily workload of a ________ drafter would generally include technical drawings of machine parts.

A. Architectural

B. Civil

C. Electrical

D. Mechanical

What is the correct answer?

4

This type of thread is a thread on the inside of a member:

A. Basic thread

B. External thread

C. Internal thread

D. Major diameter thread

What is the correct answer?

4

An Auto-CAD term that refers to a pre-drawn object which is stored in a drawing file and can be inserted into any other drawing file as needed is a ________.

A. Block

B. Brick

C. Balloon

D. None of the above

What is the correct answer?

4

In multi-view drawing it is common practice to include three views, the front, the top and the right side. If no dimensions are required on the right side view the drafter can ________.

A. Leave the view as is

B. Eliminate the view

C. Use the left view instead

D. None of the above

What is the correct answer?

4

One way to evenly space dimensions on a drawing is to use the ________.

A. Dimension Space tool

B. Linear tool

C. Continue tool

D. Baseline tool

What is the correct answer?

4

This is a line terminated by arrowheads, indicating the direction and extent of a dimension:

A. Dimension line

B. Extension line

C. Arrowhead line

D. Centerline

What is the correct answer?

4

Schematic and single-line diagrams should be arranged so that signal or transmission path from input to output proceeds in this fashion:

A. Right to left and top to bottom

B. Right to left and bottom to top

C. Left to right and top to bottom

D. Left to right and bottom to top

What is the correct answer?

4

This is a systematic approach that integrates the design and manufacture of products with the goal of optimizing the process:

A. Traditional engineering design

B. The manufacturing process

C. Concurrent design

D. Design for recycling

What is the correct answer?

4

A projection weld is a type of:

A. Resistance weld

B. Arc weld

C. Gas weld

D. Fillet weld

What is the correct answer?

4

In the section view, the areas that would have been in actual contact with the cutting plane are shown with:

A. A cutting plane line

B. Section lining

C. Visible lines

D. Lines and arrows

What is the correct answer?

4

This is the smallest diameter of a screw thread:

A. Internal thread diameter

B. Minor diameter

C. Major diameter

D. External thread diameter

What is the correct answer?

4

A ________ section allows the drafter to create a Cutting Plane line which is not in a straight line across the part.

A. Offset

B. Half

C. Whole

D. Broken out

What is the correct answer?

4

This means that a feature of a finished product contains the maximum amount of material permitted by the tolerance dimensions for that feature:

A. Maximum material condition

B. Machined material condition

C. Maximum machined indication

D. Machine mark indication

What is the correct answer?

4

The organized and orderly approach to solving problems is known as the:

A. Engineering process

B. Design process

C. Aesthetic process

D. Functional process

What is the correct answer?

4

In working drawings, these show all necessary information not given directly on the drawing with its dimensions and notes:

A. Document strips

B. Portable documents

C. Formatting forms

D. Title and record strips

What is the correct answer?

4

This type of solid has two bases that are parallel equal polygons:

A. Pyramid

B. Prism

C. Cone

D. Torus

What is the correct answer?

4

Most architectural firms and mechanical design companies utilize different categories of blocks. These sets of blocks are usually housed in ________.

A. Block vaults

B. Block libraries

C. Block books

D. Block references

What is the correct answer?

4

These units are based on inch-foot and yard measurements:

A. International customary units

B. U.S. metric units

C. U.S. customary units

D. ISO international units

What is the correct answer?

4

This is a thin solid line directing attention to a note or dimension and starting with an arrowhead or dot:

A. Dimension line

B. Extension line

C. Leader

D. Specification

What is the correct answer?

4

Elevation drawings will include information about ________.

A. Roof pitch

B. Siding

C. Window style

D. All of the above

What is the correct answer?

4

When positioning this feature of perspective projection, the centerline of the cone of visual rays should be directed toward the approximate center of the object:

A. Station point

B. Vanishing point

C. Horizon

D. Ground line

What is the correct answer?

4

In an exploded assembly drawing it is customary for the drafter to use a ________ line to illustrate how parts fit together.

A. Phantom

B. Hidden

C. Dashed

D. Center

What is the correct answer?

4

Architectural drawings used to construct a house are often plotted with a scale of ¼ = 1'-0. What scale is this?

A. Quarter

B. Half

C. Full

D. Double

What is the correct answer?

4

When designing a home for a client, one of the most important predesign considerations that an architect needs to address is ________.

A. How much money the client is willing to spend

B. The site on which the house is to sit

C. The nearest grocery store

D. Whether or not there is a curb and gutter system