Related Questions
What is the correct answer?
4
An architect often relies on a ________ to complete the set of technical drawings used in the design of an office building.
D. Construction superintendent
What is the correct answer?
4
When using versions of Auto-CAD prior to Release 2006 it may be necessary to ________ a block in order to edit it.
What is the correct answer?
4
The Free Orbit tool is found on the ________ toolbar.
What is the correct answer?
4
A secondary auxiliary view is a projection off of the ________.
C. Primary auxiliary view
What is the correct answer?
4
Before starting an isometric drawing in Auto-CAD the drafter needs to ________.
A. Set the grid to isometric
B. Set the current layer to Defpoints
What is the correct answer?
4
This type of drawing is created to calculate areas, locate property lines, and locate building projects and facilities:
What is the correct answer?
4
The daily workload of a ________ drafter would generally include technical drawings of machine parts.
What is the correct answer?
4
This type of thread is a thread on the inside of a member:
What is the correct answer?
4
An Auto-CAD term that refers to a pre-drawn object which is stored in a drawing file and can be inserted into any other drawing file as needed is a ________.
What is the correct answer?
4
In multi-view drawing it is common practice to include three views, the front, the top and the right side. If no dimensions are required on the right side view the drafter can ________.
C. Use the left view instead
What is the correct answer?
4
One way to evenly space dimensions on a drawing is to use the ________.
What is the correct answer?
4
This is a line terminated by arrowheads, indicating the direction and extent of a dimension:
What is the correct answer?
4
Schematic and single-line diagrams should be arranged so that signal or transmission path from input to output proceeds in this fashion:
A. Right to left and top to bottom
B. Right to left and bottom to top
C. Left to right and top to bottom
D. Left to right and bottom to top
What is the correct answer?
4
This is a systematic approach that integrates the design and manufacture of products with the goal of optimizing the process:
A. Traditional engineering design
B. The manufacturing process
What is the correct answer?
4
A projection weld is a type of:
What is the correct answer?
4
In the section view, the areas that would have been in actual contact with the cutting plane are shown with:
What is the correct answer?
4
This is the smallest diameter of a screw thread:
A. Internal thread diameter
D. External thread diameter
What is the correct answer?
4
A ________ section allows the drafter to create a Cutting Plane line which is not in a straight line across the part.
What is the correct answer?
4
This means that a feature of a finished product contains the maximum amount of material permitted by the tolerance dimensions for that feature:
A. Maximum material condition
B. Machined material condition
C. Maximum machined indication
D. Machine mark indication
What is the correct answer?
4
The organized and orderly approach to solving problems is known as the:
What is the correct answer?
4
In working drawings, these show all necessary information not given directly on the drawing with its dimensions and notes:
D. Title and record strips
What is the correct answer?
4
This type of solid has two bases that are parallel equal polygons:
What is the correct answer?
4
Most architectural firms and mechanical design companies utilize different categories of blocks. These sets of blocks are usually housed in ________.
What is the correct answer?
4
These units are based on inch-foot and yard measurements:
A. International customary units
D. ISO international units
What is the correct answer?
4
This is a thin solid line directing attention to a note or dimension and starting with an arrowhead or dot:
What is the correct answer?
4
Elevation drawings will include information about ________.
What is the correct answer?
4
When positioning this feature of perspective projection, the centerline of the cone of visual rays should be directed toward the approximate center of the object:
What is the correct answer?
4
In an exploded assembly drawing it is customary for the drafter to use a ________ line to illustrate how parts fit together.
What is the correct answer?
4
Architectural drawings used to construct a house are often plotted with a scale of ¼ = 1'-0. What scale is this?
What is the correct answer?
4
When designing a home for a client, one of the most important predesign considerations that an architect needs to address is ________.
A. How much money the client is willing to spend
B. The site on which the house is to sit
C. The nearest grocery store
D. Whether or not there is a curb and gutter system