Related Questions
What is the correct answer?
4
An Auto-CAD term that refers to a pre-drawn object which is stored in a drawing file and can be inserted into any other drawing file as needed is a ________.
What is the correct answer?
4
This means that a feature of a finished product contains the maximum amount of material permitted by the tolerance dimensions for that feature:
A. Maximum material condition
B. Machined material condition
C. Maximum machined indication
D. Machine mark indication
What is the correct answer?
4
When creating a Cutting Plane line with Auto-CAD it is customary to use a ________ to create the line.
What is the correct answer?
4
The building construction industry relies on sets of ________ drawings to construct homes and commercial buildings.
What is the correct answer?
4
This is formed where three or more surfaces intersect:
What is the correct answer?
4
These breaks are used to shorten the view of an object:
What is the correct answer?
4
When only a small section of an interior area needs to be revealed the drafter can use a ________ section.
What is the correct answer?
4
Most architectural firms and mechanical design companies utilize different categories of blocks. These sets of blocks are usually housed in ________.
What is the correct answer?
4
Architectural dimensioning standards allow for the placement of dimensions inside the floor plan. These inside dimensions locate interior __________.
A. Door openings and walls
What is the correct answer?
4
The principle views associated with orthographic projection are ________.
What is the correct answer?
4
This type of weld is the most common in structural steel fabrication:
What is the correct answer?
4
On a floor plan the dashed line that appears approximately 24 outside the exterior wall represents the __________.
What is the correct answer?
4
This type of auxiliary view is projected onto a plane that is perpendicular to one of the principal planes of projection:
What is the correct answer?
4
This is a conical-shaped recess around a hole, often used to receive a tapered screw head:
What is the correct answer?
4
4.The principle reason for using an auxiliary view is ________.
A. To eliminate hidden lines
B. To create a true projection plane from an inclined plane in one of the primary views
C. To show cylinders as ellipses
D. To locate center marks
What is the correct answer?
4
The title block used on working drawings should include the __________.
What is the correct answer?
4
These gears transmit power between shafts whose axes intersect at any angle:
What is the correct answer?
4
The text used on a typical detail sheet should be ________.
C. In an architectural text style
What is the correct answer?
4
This type of solid is formed by sweeping a shape along a linear path:
What is the correct answer?
4
When creating a block the drafter needs to pay particular attention to selecting a base point because it determines the ________.
What is the correct answer?
4
The Free Orbit tool is found on the ________ toolbar.
What is the correct answer?
4
There are two main types of projection:
A. Parallel and Orthographic
B. Station-point and Perspective
C. Parallel and Convergent
D. Perspective and Parallel
What is the correct answer?
4
These are special installations of stone or concrete marking the locations of points accurately determined by precise surveying:
What is the correct answer?
4
These drawings are given to contractors to perform work or manufacture individual parts:
What is the correct answer?
4
Architectural drawings used to construct a house are often plotted with a scale of ¼ = 1'-0. What scale is this?
What is the correct answer?
4
Objects that are symmetric can be shown effectively using this type of section:
What is the correct answer?
4
When dimensioning architectural drawings architects will utilize both ________ and ________ options.
A. Baseline and continuous
What is the correct answer?
4
Approximately this much of the cost of product development and manufacture is determined at the design stage:
What is the correct answer?
4
PDM is the acronym for:
A. Project drawing management
B. Product drawing manipulation
C. Product data management
D. Project data manipulation
What is the correct answer?
4
One way to evenly space dimensions on a drawing is to use the ________.