(i) and (iii) are correct
(i) and (iv) are correct
(ii) and (iii) are correct
(ii) and (iv) are correct
B. (i) and (iv) are correct
80 and 90
90 and 80
85 and 75
75 and 83
Activity arrows in a CPM network are drawn to scale
The tail of an arrow represents the finish of an activity
Arrow bead represents the start of an activity
None of the above
Bar chart method
Milestone chart
Critical path method (CPM)
Programme Evaluation and Review Technique (PERT)
Optimistic time estimate refers to activities
Pessimistic time estimate refers to activities
Most likely time estimate refers to activities
All the above
Digging of foundation started
Digging of foundation completed
Laying of concrete started
All the above
Rs. 1740
Rs. 3480
Rs. 5220
Rs. 6960
An analytic in concept
Limited of event oriented diagrams
Used for research and development projects
All the above
On commencement of work at site for payment of loan taken by him
For the purchase of construction materials
For the payment of advances to labour and other staff
For all activities required to start the work at site on finalization of the contract document
Light construction
Heavy construction
Industrial construction
Private construction
Assistant Engineer
Executive Engineer
Superintending Engineer
Chief Engineer
1880
1900
1920
1940
Crash time
Normal time
Optimistic time
Between normal time and crash time
Maximum float
Minimum float
Zero float
None of these
10000 kg
12500 kg
22500 kg
5000 kg
Drag line
Hoe
Clam shell
Dipper shovel
Drag line
Hoe
Clam shell
Dipper shovel
The detailed estimated cost based on detailed design
The several alternatives of the project that have been considered
The soil survey, traffic survey, concept design and approximate cost
The contract documents for inviting tenders
Resources
Project duration time
Both resources and project duration time
None of the above
Crash time
Normal time
Optimistic time
Standard time
A person
A firm
An agency
All the above
1-2 is 4
2-3 is 7
3-4 is 8
All the above
Minimum
Maximum
Zero
Infinite
Concrete cured
Fixing of door
Plastering of walls
Selecting sites
Rs. 8,43,750
Rs. 8,75,000
Rs. 10,50,000
Rs. 11,56,250
Preparation of estimate
Survey of the site
Initiation of proposal
Preparation of tender
Effective command and control
Rigid discipline in the organisation
Defined responsibilities at all levels
All the above
Planning
Designing
Execution
All the above
Executive Engineer
Engineer
Junior Engineer
Assistant Engineer
Measurement of risks to eliminate failures
Applying the theory' of probability to sample testing or inspection
Reduction in wastage of inspection costs
Reduction in costs for the removal of defects
1, 2, 4, 3, 5
1, 3, 2, 4, 5
1, 2, 3, 4, 5
1, 3, 4, 2, 5