1880
1900
1920
1940
B. 1900
A is correct but R is not correct
R is correct but A is not correct
Both A and R is correct
Both A and R is incorrect
Normal distribution curve
Poisson's distribution curve
Beta distribution curve
None of the above
30 kg
300 kg
900 kg
1000 kg
Is an improvement upon bar chart method
Provides a realistic approach to daily problems
Avoids delays which are very common in bar charts
All the above
A person
A firm
An agency
All the above
Emphasis is given to activities
Uncertainties are not allowed
Activities are represented by arrows
All the above
Identify the activities which can be delayed without affecting the total float of preceding activity
Identify the activities, which can be delayed without affecting the total float of succeeding activity
Establish priorities
Identify the activities which can be delayed without affecting the total float of either the preceding or succeeding activities
An activity of a project is denoted by an arrow on the net work
The tail of the arrow indicates the start of the activity
The head of the arrow indicates the end of the activity
The arrows are drawn to scale from left to right
Programme Evaluation and Review Technique, is event oriented
Programme Evaluation and Review Technique is not event oriented
Critical Path Method is event oriented
Critical Path method is event oriented
Optimistic time
Pessimistic time
Most likely time
All the above
Minimum
Maximum
Zero
Infinite
Moist loam
Sand and gravel
Good common earth
Wet sticky clay
Ice
Concrete
Loose sand
Earth
8 days
9 days
10 days
15 days
Total float
Free float
Interfering float
Independent float
On commencement of work at site for payment of loan taken by him
For the purchase of construction materials
For the payment of advances to labour and other staff
For all activities required to start the work at site on finalization of the contract document
Line organisation
Line and staff organisation
Functional organisation
Effective organisation
Strict adherence to specifications
Separation of planning and design part
Each individual maintains functional efficiency
All the above
Excavation for foundation
Curing of concrete
Setting of question paper
All the above
Line organisation
Line and staff organisation
Functional organisation
Effective organisation
Vertical lines
Horizontal lines
Dots
Crosses
Is artificially introduced
Is represented by a dotted line
Does not consume time
All the above
Free float of the activity must be zero but independent float need not be zero
Independent float must be zero but free float need not be zero
Free float and independent float both must be zero
Free float and independent float both need not be zero
The duration between the earliest start time of the preceding event and latest finish time of the succeeding event, is called 'float'
The duration of time by which an activity can be delayed without affecting the succeeding activity, is called free float
The difference between total float and free float, is called interfering float
All the above
Concrete
Loose sand
Asphalt
Firm earth
Rs. 4,75,000
Rs. 5,75,000
Rs. 6,50,000
Rs. 8,50,000
Rs. 31050
Rs. 34500
Rs. 37950
Rs. 50000
Decreasing the direct cost and increasing indirect cost
Increasing the direct cost and decreasing the indirect cost
Increasing the direct cost and indirect cost both
Decreasing the direct cost and indirect cost both
20 kg/tonne
30 kg/tonne
40 kg/tonne
50 kg/tonne
Dummy
Event
Activity
Contract