Moist loam
Sand and gravel
Good common earth
Wet sticky clay
D. Wet sticky clay
Normal durations for all the activities
Crash durations for all activities
Crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the activities
Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the activities
Assistant Engineer
Executive Engineer
Superintending Engineer
Chief Engineer
Trimming and finishing
Shaping and trimming
Finishing and shaping
Finishing, shaping and trimming
To concentrate his attention on critical activities
To divert the resources from non-critical advanced activities to critical activities
To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
All the above
Its latest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest start time and earliest finish time
Its earliest finish time and earliest start time for its successor activity
1, 2, 4, 3, 5
1, 3, 2, 4, 5
1, 2, 3, 4, 5
1, 3, 4, 2, 5
100% at the site
67% at the site and 33% under procurement
50% at the site and 50% under procurement
33% at the site and 67% under procurement
Resources
Project duration time
Both resources and project duration time
None of the above
Drag line
Hoe
Clam shell
Dipper shovel
Determines the status of each activity
Adjusts automatically changes in activity progress
Is a dynamic system
None of these
An activity of a project is denoted by an arrow on the net work
The tail of the arrow indicates the start of the activity
The head of the arrow indicates the end of the activity
The arrows are drawn to scale from left to right
The float may be positive, zero or negative
If the float is positive and the activity is delayed by a period equal to its total float, the completion of project is not delayed
If the float of an activity is negative, delay in its performance is bound to delay the completion of project
All the above
An activity
An event
Both event and activity
None of the above
Vertical lines
Horizontal lines
Dots
Crosses
Synthesising in concepts
Is built of activities oriented programme
Is based on time estimate
All the above
The fund for rebuilding a structure when its economic life is over
Raised to meet maintenance costs
The total sum to be paid to the municipal authorities by the tenants
A part of the money kept in reserve for providing additional structures and structural modifications
Optimistic time estimate refers to activities
Pessimistic time estimate refers to activities
Most likely time estimate refers to activities
All the above
(i), (ii) and (iv) are correct
(ii), (iii) and (iv) are correct
(i), (iii) and (iv) are correct
(i), (ii) and (iii) are correct
Line organisation
Line and staff organisation
Functional organisation
Effective organisation
Kneading
Pressing
Tamping
Vibration
Drag line
Hoe
Clam shell
Dipper shovel
Its earliest finish time and earliest start time for its successor activity
Its latest start time and earliest start time
Its latest finish time and earliest start time for its successor activity
Its earliest finish time and latest start time for its successor activity
3.5 and 5/6
5 and 25/36
3.5 and 25/36
4 and 5/6
A circle
A square
A triangle
All the above
4 days
6 days
10 days
16 days
Moist loam
Good common earth
Well blasted rock
Wet sticky clay
Light construction
Heavy construction
Industrial construction
Private construction
Comparison of profit and loss
Comparison of assets and liabilities
Change in output due to change in input
Economics of cost and benefits of the project
Rs. 31050
Rs. 34500
Rs. 37950
Rs. 50000
Moist loam
Sand and gravel
Good common earth
Wet sticky clay