Excavation for foundation
Curing of concrete
Setting of question paper
All the above
D. All the above
1910
1920
1930
1940
Decreasing the direct cost and increasing indirect cost
Increasing the direct cost and decreasing the indirect cost
Increasing the direct cost and indirect cost both
Decreasing the direct cost and indirect cost both
Small projects
Large and complex projects
Research and development projects
Deterministic activities
Departmental representative or user
Local civil authority representative
Representative of engineer authority
All the above
Reduce by 200 kg
Increase by 200 kg
Increase by 250 kg
Reduce by 250 kg
Line organisation
Line and staff organisation
Functional organisation
Effective organisation
50 %
84.1 %
99.9 %
100 %
Trimming and finishing
Shaping and trimming
Finishing and shaping
Finishing, shaping and trimming
An engineer
An architect
An owner
All the above
Event
Dummy
Duration
Float
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
All the above
Start float and finish float are always equal.
Total float can be either start float or finish float.
Start float and finish float need not be equal.
Start float and finish float are the differences between activity times and not event times.
Synthesising in concepts
Is built of activities oriented programme
Is based on time estimate
All the above
Event
Float
Duration
Constraint
Minimum
Maximum
Zero
Infinite
Event flow scheduling technique
Critical ratio scheduling
Slotting technique for scheduling
Short interval scheduling
A critical path always begins at the very first event.
A critical path always terminates at the last event.
Critical activities control the project duration.
Critical activity is the one for which free float is zero.
Drag line
Hoe
Clam shell
Dipper shovel
Rs. 31050
Rs. 34500
Rs. 37950
Rs. 50000
Event
Free float
Dummy
Constraint
Activity arrows in a CPM network are drawn to scale
The tail of an arrow represents the finish of an activity
Arrow bead represents the start of an activity
None of the above
Maximum float
Minimum float
Zero float
None of these
500 cum
1000 cum
1500 cum
2000 cum
The fund for rebuilding a structure when its economic life is over
Raised to meet maintenance costs
The total sum to be paid to the municipal authorities by the tenants
A part of the money kept in reserve for providing additional structures and structural modifications
to + 3tm+ tp/3
to + 4tm+ tp/4
to + 4tm+ tp/5
to + 4tm+ tp/6
Moist loam
Good common earth
Well blasted rock
Wet sticky clay
Normal durations for all the activities
Crash durations for all activities
Crash durations for all the activities along the critical path obtained by taking into account the normal duration for all the activities
Crash durations for all the activities along the critical path obtained by taking into account the crash duration for all the activities
EF = ES + D
LS = LF - D
LF = LS + D
All the above
Comparison of profit and loss
Comparison of assets and liabilities
Change in output due to change in input
Economics of cost and benefits of the project
Kneading
Pressing
Tamping
Vibration