Preparation of estimate
Survey of the site
Initiation of proposal
Preparation of tender
C. Initiation of proposal
50 %
84.1 %
99.9 %
100 %
Rigid structure
Extraordinary delay in communications
Top level executions over work
All the above
Preparation of specifications
Preparation of estimates
Initiating the procurement action of resources
All the above
1 and 4 are correct
2 and 3 are correct
1 and 4 are correct
1 and 2 are correct
Small projects
Large and complex projects
Research and development projects
Deterministic activities
1-2 is 4
2-3 is 7
3-4 is 8
All the above
1, 2 and 3 are correct
1 and 4 are correct
2, 3 and 4 are correct
1, 2 and 4 are correct
A person
A firm
An agency
All the above
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
All the above
Controlling the total quantity at each batch
Weighing accurately, the quantity of each material for a job before mixing
Controlling the quantity of each material into each batch
Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
Having a single lump, are called uninodal curves
If symmetrical, are called normal curves
If not symmetrical, are called skew curves
All the above
Normal distribution curve
Poisson's distribution curve
Beta distribution curve
None of the above
Preparation of estimate
Survey of the site
Initiation of proposal
Preparation of tender
On commencement of work at site for payment of loan taken by him
For the purchase of construction materials
For the payment of advances to labour and other staff
For all activities required to start the work at site on finalization of the contract document
Shows the interdependencies of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of these
To concentrate his attention on critical activities
To divert the resources from non-critical advanced activities to critical activities
To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
All the above
CPM analysis is activity oriented
PERT analysis is event oriented
In CPM, the time is related to cost
All the above
Programme Evaluation and Review Technique, is event oriented
Programme Evaluation and Review Technique is not event oriented
Critical Path Method is event oriented
Critical Path method is event oriented
An engineer
An architect
An owner
All the above
3.5 and 5/6
5 and 25/36
3.5 and 25/36
4 and 5/6
Comparison of profit and loss
Comparison of assets and liabilities
Change in output due to change in input
Economics of cost and benefits of the project
Decreasing the direct cost and increasing indirect cost
Increasing the direct cost and decreasing the indirect cost
Increasing the direct cost and indirect cost both
Decreasing the direct cost and indirect cost both
LST-EST
LFT-EFT
TL-EFT
All the above
Minor works
Major works
Large projects
All the Above
Crash time
Normal time
Optimistic time
Between normal time and crash time
Event
Free float
Dummy
Constraint
Activity of an excavation of a footing
Activity of an excavation which starts at event No. 1 and ends at even No. 2
Activity of excavation which takes 8 units of time
None of these
Light construction
Heavy construction
Industrial construction
Private construction
4 days
6 days
10 days
16 days
Dummy
Event
Activity
Contract