Departmental representative or user
Local civil authority representative
Representative of engineer authority
All the above
D. All the above
EF = ES + D
LS = LF - D
LF = LS + D
All the above
30 kg
300 kg
900 kg
1000 kg
The various functions under each activity, are shown by one bar on Bar Charts
Bar chart establishes the interdependency of one event on another
Only approximate percentage of the completed work is reported
None of these
Moist loam
Sand and gravel
Good common earth
Wet sticky clay
Only (i) is correct
(i) and (ii) are correct
(i) and (iii) are correct
(ii) and (iii) are correct
Excavation for foundation
Curing of concrete
Setting of question paper
All the above
Effective command and control
Rigid discipline in the organisation
Defined responsibilities at all levels
All the above
On commencement of work at site for payment of loan taken by him
For the purchase of construction materials
For the payment of advances to labour and other staff
For all activities required to start the work at site on finalization of the contract document
Minor works
Major works
Large projects
All the Above
2.3% and 84.1%
97.7% and 84.1%
97.7 % and 15.9%
15.9% and 97.7%
to + 3tm+ tp/3
to + 4tm+ tp/4
to + 4tm+ tp/5
to + 4tm+ tp/6
Shows the interdependencies of various jobs
Depicts the delay of jobs, if any
Points outgoing ahead of schedule of jobs, if any
None of these
Assistant Engineer
Executive Engineer
Superintending Engineer
Chief Engineer
Emphasis is given to activities
Uncertainties are not allowed
Activities are represented by arrows
All the above
Site located
Foundation is being dug
The office area is being cleaned
The invitations are being sent
Smooth-wheeled rollers
Vibratory rollers
Sheep foot rollers
Tampers
Resources
Project duration time
Both resources and project duration time
None of the above
1-2 is 4
2-3 is 7
3-4 is 8
All the above
Reduce by 200 kg
Increase by 200 kg
Increase by 250 kg
Reduce by 250 kg
Ice
Concrete
Loose sand
Earth
CPA (Critical Path Analysis)
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
All the above
Controlling the total quantity at each batch
Weighing accurately, the quantity of each material for a job before mixing
Controlling the quantity of each material into each batch
Adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
Total float and free float
Total float and independent float
Free float and independent float
None of the above
Event
Node
Connector
All the above
Both A and R is true and R is the correct explanation of A
Both A and R is true but R is not the correct explanation of A
A is true but R is false
A is false but R is true
Dummy
Event
Activity
Contract
The latest occurrence time of the node of which the activity arrow terminates minus the duration of the activity, is called latest start time
The latest occurrence time for the node at which the activity arrow terminates, is called latest finish time
Earliest occurrence time of the event from which the activity arrow' originates, is called earliest start time of the activity
All the above
1910
1920
1930
1940
20
25
35
15
An activity of a project is denoted by an arrow on the net work
The tail of the arrow indicates the start of the activity
The head of the arrow indicates the end of the activity
The arrows are drawn to scale from left to right