Preparation of specifications
Preparation of estimates
Initiating the procurement action of resources
All the above
D. All the above
The duration between the earliest start time of the preceding event and latest finish time of the succeeding event, is called 'float'
The duration of time by which an activity can be delayed without affecting the succeeding activity, is called free float
The difference between total float and free float, is called interfering float
All the above
The activity is the time consuming part of a project
The beginning and end of a job, are called events
The activity which consumes maximum time, is called a node
Logically and sequentially connected activities and events form a network
(i) and (iii) are correct
(i) and (iv) are correct
(ii) and (iii) are correct
(ii) and (iv) are correct
LST-EST
LFT-EFT
TL-EFT
All the above
Resources
Project duration time
Both resources and project duration time
None of the above
Cheapest critical activity
Cheapest noncritical activity
Costliest critical activity
Costliest noncritical activity
Light construction
Heavy construction
Industrial construction
None of these
10000 kg
12500 kg
22500 kg
5000 kg
Start float and finish float are always equal.
Total float can be either start float or finish float.
Start float and finish float need not be equal.
Start float and finish float are the differences between activity times and not event times.
Minimum
Maximum
Zero
Infinite
Trimming and finishing
Shaping and trimming
Finishing and shaping
Finishing, shaping and trimming
Rs. 4,75,000
Rs. 5,75,000
Rs. 6,50,000
Rs. 8,50,000
Event
Float
Duration
Constraint
Moist loam
Sand and gravel
Good common earth
Wet sticky clay
Total float and free float
Total float and independent float
Free float and independent float
None of the above
Executive Engineer
Engineer
Junior Engineer
Assistant Engineer
Forward pass is used for calculating earliest expected time
Backward pass is used for calculating the latest occurrence time
Maximum value of earliest expected time is used if there is more than one value of any event
All the above
Rs. 8,43,750
Rs. 8,75,000
Rs. 10,50,000
Rs. 11,56,250
Total float
Free float
Interfering float
Independent float
Resource levelling
Resource smoothening
Updating
Critical path scheduling
Number of operations
Output of labour
Output of machinery
All the above
Bar chart
Gantt chart
Modified Mile stone chart
All the above
(ii), (iii) and (iv) are correct
(i), (ii) and (iv) are correct
(i), (iii) and (iv) are correct
(i) and (iv) are correct
Is always longest
Is always shortest
May be longest
May be shortest
On commencement of work at site for payment of loan taken by him
For the purchase of construction materials
For the payment of advances to labour and other staff
For all activities required to start the work at site on finalization of the contract document
2.3% and 84.1%
97.7% and 84.1%
97.7 % and 15.9%
15.9% and 97.7%
Positive
Negative
Zero
Same
Rs. 31050
Rs. 34500
Rs. 37950
Rs. 50000
Earliest start of an activity is the early event time of the node it leaves.
Latest finish of an activity is the late event time of the node it enters.
Latest start of an activity is its latest finish minus its duration.
None of the above
An analytic in concept
Limited of event oriented diagrams
Used for research and development projects
All the above